People & Institutions
Former director general of the parks department, Baghdad Mayoralty (unnamed)
المدير العام السابق لدائرة المتنزهات في أمانة بغداد (لم يُذكر اسمه)
This page sets out what the documents in this archive record about this person: the legal status on the date shown, the cases, the official registers and the sources.
Legal status as of 20 October 2026
Convicted (reported)
Reported convicted by credible media or an official statement; the judgment itself not seen.
What the documents say
Sentenced in absentia with the former mayor to seven years under Article 340 over the Army Canal development contract, which the Integrity Commission said was signed with an Egyptian and a local company without cost estimates (statement of 23 January 2019). Not named.
- Kind
- Person
- Roles
- Director general of the parks department, Baghdad Mayoralty
Cases
These are the cases in this archive that name this entry, with the status in each case on the date shown.
| Case | Role | Status in this case | Detail | As of |
|---|---|---|---|---|
| Baghdad Mayoralty: the Army Canal contract and the cases against former mayors Saber al-Issawi and Naim Aboub (from 2011 to 2023) | Director general of the parks department, Baghdad Mayoralty | Convicted (reported) | Sentenced in absentia with the former mayor to seven years under Article 340 over the Army Canal development contract, which the Integrity Commission said was signed with an Egyptian and a local company without cost estimates (statement of 23 January 2019). Not named. | 19 October 2026 |
Dated events
Each recorded step in the legal record of this entry is listed here in order of date.
- 23 January 2019Convicted (reported)Seven years in absentia
Documents
These are the documents behind this entry. Each quote is given in the language of the document.
- Alsumaria News23 January 2019Official statement reported by the mediaTier B
النزاهة: الحكم بسجن أمين بغداد السابق لإضراره المال العام بأكثر من 12 مليون دولار
Original address"تمَّ التعاقد مع شركةٍ مصريَّةٍ وأخرى محليَّةٍ، استناداً لقرار اللجنة الرئيسة للتعاقد في الأمانة دون إعداد الكلف التخمينيَّـة للمشروع، وأنَّ مقدار الضرر الحاصل بلغ (12,165,350)