People & Institutions
Former director general of Baghdad sewerage and former head of contracts, Baghdad Mayoralty (two people, unnamed)
المدير العام السابق لمجاري بغداد ومدير قسم العقود السابق في أمانة بغداد (شخصان لم يُذكر اسماهما)
This page sets out what the documents in this archive record about this person: the legal status on the date shown, the cases, the official registers and the sources.
Legal status as of 20 October 2026
Under investigation
Named by an official body as under investigation; not charged.
What the documents say
The Rusafa integrity investigation court summoned them, with a former mayor, under Article 340 over violations in the contract to supply, install and operate a Baghdad wastewater project awarded to the Swedish company EPC (Integrity Commission statement, 11 May 2023). Not named; no later step is on record.
- Kind
- Person
- Roles
- Director general of the Baghdad Sewerage Directorate; head of the contracts department of the mayoralty
Cases
These are the cases in this archive that name this entry, with the status in each case on the date shown.
| Case | Role | Status in this case | Detail | As of |
|---|---|---|---|---|
| Baghdad Mayoralty: the Army Canal contract and the cases against former mayors Saber al-Issawi and Naim Aboub (from 2011 to 2023) | Director general of the Baghdad Sewerage Directorate; head of the contracts department of the mayoralty | Under investigation | The Rusafa integrity investigation court summoned them, with a former mayor, under Article 340 over violations in the contract to supply, install and operate a Baghdad wastewater project awarded to the Swedish company EPC (Integrity Commission statement, 11 May 2023). Not named; no later step is on record. | 19 October 2026 |
Dated events
Each recorded step in the legal record of this entry is listed here in order of date.
- 11 May 2023Under investigationSummoned under Article 340
Documents
These are the documents behind this entry. Each quote is given in the language of the document.
- 96411 May 2023Official statement reported by the mediaTier B
استقدام أمين بغداد الأسبق بتهمة الإضرار بالمال العام.. شبهات حول عقد سويدي
Original addressجرَّاء المخالفات المُرتكبة في عقد تجهيز ونصب وتشغيل مشروع ماء الصرف الصحي في بغداد المحال على شركة