The Ministry of Industry and Minerals is a third window through which state land and assets pass to private firms. It grants licences for industrial projects and letters that allocate land. It licenses the developers of industrial cities. Its state companies sign partnership and rehabilitation contracts for state factories. This register holds 209 projects and contracts found in official statements and audit reports, and 41 officials who headed the ministry, its directorates or its companies, each with an exact legal status.

All registers

In short

This register holds 209 records: 123 licences, industrial cities and land allocations, and 86 partnership and rehabilitation contracts for state factories. The courts, the Board of Supreme Audit, the Integrity Commission and Parliament have produced 27 recorded rulings, audit findings, investigations and accusations about this window. Of the 41 officials who headed the ministry, its directorates or its companies, 7 were convicted or reported convicted, 2 were charged or arrested, 9 were accused, investigated or removed by an official body, 2 were accused in the press only, and 21 are not charged.

Areas are given in dunums. A dunum is 2,500 square metres, a quarter of a hectare.

Terms on this page, explained in the glossary: Investment licence, Dunum, Federal Board of Supreme Audit, Integrity Commission.

Who decides

Who decides
DecisionBody that decidesLegal basis
Licence to set up a private or mixed industrial projectGeneral Directorate for Industrial Development, within 15 daysLaw 20 of 1998, Articles 3 and 6
State land for a licensed projectThe state bodies concerned allocate the land and lease it at a fair rent. In practice the Directorate issues the allocation letter and the State Real Estate Directorate signs the lease.Law 20 of 1998, Article 9
Exemption from taxes and fees for ten years, except income taxFollows from the licence. The Cabinet may add an exemption for a strategic project, case by case.Law 20 of 1998, Article 8
Licence to build, develop or run an industrial cityIndustrial Cities Authority, under a board chaired by the minister. No answer within 30 days counts as approval.Law 2 of 2019, Articles 4, 6 and 9
Partnership, rehabilitation and investment contracts for state factoriesThe board of the state company decides and the ministry approves. Strategic cases go to the Cabinet.Public Companies Law 22 of 1997, Articles 15 and 26
Source: Industrial Investment Law for the Private and Mixed Sectors No. 20 of 1998, Industrial Cities Law No. 2 of 2019 and Public Companies Law No. 22 of 1997.Tier A

In figures

Counts of licences and contracts, and areas, as given in the ministry's statements and in reports of the Board of Supreme Audit.
Figures on the Ministry of Industry
PeriodWhat the figure measuresFigureSource
2016Investment and partnership contracts of the Ministry of Industry and Minerals (acting minister's request to the Integrity Commission, 25 Oct 2016)170
contracts
Document (saved page)Alsumaria
2019Investment projects and contracts signed by the Ministry in 201936
contracts
Document (saved page)Alsumaria
2026State companies and plants under the Ministry (published 2026 data, as cited by Al-Rawabet Center)312
plants (31 companies; 225 working; 87 stopped)
Document (saved page)Shafaq News
2026Partnership contracts with the private sector announced by the Ministry (as cited by Al-Rawabet Center)144
contracts in implementation (about 90 more under evaluation; 234 in all)
Document (saved page)Shafaq News
the first quarter of 2024Preliminary (establishment) licences for new industrial projects, first quarter219
licences
Document (saved page)Iraq Business News
2025Establishment licences for new industrial projects granted by the General Directorate for Industrial Development1,867
licences
Document (saved page)Iraq Business News
2025Land-allocation letters for industrial projects856
letters
Document (saved page)Iraq Business News
April 2025Preliminary licences, April 2025165
licences
Document (saved page)Iraq Business News
May 2025Preliminary licences, May 2025172
licences
Document (saved page)Iraq Business News
September 2025Preliminary licences, September 2025180
licences
Document (saved page)Iraq Business News
November 2025Licences for new industrial projects, November 2025158
licences
Document (saved page)Iraq Business News
February 2026Establishment licences for new industrial projects, February 2026230
licences
Document (saved page)Iraq Business News
March 2026Preliminary licences, March 2026124
licences
Document (saved page)Iraq Business News
2026Dhi Qar Industrial City (Industrial Cities Authority): area2,000
dunums
Document (saved page)Iraq Business News
March 2025Green Mountain Industrial City, Basra (General Company for Iron and Steel with China's Tsingshan): area and contract value2,000
dunums (contract value USD 2 billion, signed Mar 2025)
Document (saved page)Iraq Business News
September 2025Industrial cities approved by the Authority's board: Babylon pharmaceutical city 708, Babylon Gateway 2,000, Akkad (Rashidiya, Baghdad) 1252,833
dunums in three cities
Document (saved page)Iraq Business News
April 2025Rent in industrial-city plots (Ministerial Council for the Economy decision)250,000
IQD a month per half-dunum plot, years 3 to 5
Document (saved page)Iraq Business News
June 2020Integrity Commission proposal: rent for industrial land, assessed every 10 years3
percent of land value (ceiling)
Document (saved page)Alsumaria
2023FBSA: brick plants and gas offices operating on state land with expired leases, Maysan43
sites (41 brick plants and 2 gas offices)
Federal Board of Supreme AuditDocument, p.226[1]Document, p.607[2]
2024FBSA: brick and asphalt plants whose leases expired 8 to 12 years earlier, Babil12
years (longest lapse)
Federal Board of Supreme AuditDocument, p.226[1]Document, p.596[2]
from 2019 to 2025FBSA: Al-Nawra lime plant (Karbala), investor's share of rehabilitation done45
percent (line 1 at 7.6; line 2 at 82)
Federal Board of Supreme AuditDocument, p.295[1]Document, p.296[2]
2023FBSA: plant stores sold to the Al-Nawra investor and booked as its debt, end-20233,309,649,219
IQD
Document, p.296Federal Board of Supreme Audit
2023FBSA: salaries paid by the Fallujah White Cement plant instead of the investor, 13 Jan to 31 Aug 20234,562,085,000
IQD
Document, p.299Federal Board of Supreme Audit
2024FBSA: copper scrap received by the Ur partnership project (about 40 percent of output needed)64,075
tonnes
Document, p.299Federal Board of Supreme Audit
2024FBSA: scrap used and unpaid by the Nour Sawi partner, State Company for Steel Industries27,879
tonnes (IQD 5,914,232 thousand)
Federal Board of Supreme AuditDocument, p.300[1]Document, p.301[2]
2024FBSA: spent from the IQD 48,660 million rehabilitation allocation for the former Nasr plants before contract 5 of 5 Sep 202421,710,112,000
IQD
Document, p.301Federal Board of Supreme Audit
2025FBSA: Industrial Cities Authority contract 4 of 2021 with Al-Yusra, change by addendum 2 (21 Apr 2025)6
years of implementation (from 3); development period 45 years (from 40)
Document, p.303Federal Board of Supreme Audit
2024FBSA: Mosul dairy plant: first-instance compensation awarded against the investor (9 Dec 2024), under appeal25,379,000,000
IQD
Document, p.304Federal Board of Supreme Audit
2023Integrity Commission: loss on cement sold at IQD 60,000 a tonne against the official IQD 65,000 (first batch of 1,300,000 tonnes)6,500,000,000
IQD (more than)
Document (saved page)Alsumaria

Projects and contracts

209 records: industrial cities, land allocations, and partnership and rehabilitation contracts. The ministry publishes no register of its licences or of its contracts. These records were gathered from its statements, from reports of the Board of Supreme Audit and from the press.

Records that match: 7.

  1. 19 March 2025Partnership and rehabilitation contracts

    Development of the sulphuric acid plant to cut gas emissions to the required environmental limit (420 ppm)

    Investor or partner
    Amar al-Rafidain International Group for Trade, General Contracting and Agricultural and Industrial Investment (LLC, Iraqi), as spelled in the audit bureau's report
    مجموعة اعمار الرافدين الدولية للتجارة والمقاولات العامة والاستثمار الزراعي والصناعي محدودة المسؤولية
    State company
    Furat General Company for Chemical Industries and Pesticides, Babil
    Terms
    Addendum 3 of contract No. 7 of 19 March 2025, of IQD 375,000,000, for the development of the plant. The report gives the contract's estimated cost as IQD 2,822,550,000, equal to the contract value and charged to the 2024 operating budget.
    Value
    375,000,000 IQD (addendum 3). The contract is stated at IQD 2,822,550,000
    Course of the project
    This is a service and development contract paid from the company's budget and not a partnership. In February 2026 the company said the old sulphuric acid plant was dismantled and replaced by a new one designed and built with in-house capabilities, in coordination with the consultancy office of Al-Mustansiriya University, in full production since mid-September 2025. The sources do not link that plant to this contract.
    Official findings
    FBSA report 19815 of 4 August 2025 on addendum 3 of contract No. 7 of 19 March 2025 found that the company did not change the amount of the guarantee letter of the original contract and its addenda so as to cover the value of the contract and the addendum, contrary to Article 9, third, (c) of the Government Contract Execution Instructions No. 2 of 2014. The Board recommended… Read the rest investigation. No outcome was found. Named in this matter without any allegation (not charged as of the date of writing).
    Wording of the source
    «شركة (مجموعة اعمار الرافدين الدولية للتجارة والمقاولات العامة والاستثمار الزراعي والصناعي محدودة المسؤولية)» [storage.fbsa.gov.iq] … … «عدم قيام الشركة بتعديل مبلغ خطاب الضمان الخاص بالعقد الأصلي وملاحقه لغرض تغطية قيمة العقد والملحق الخاص به» [storage.fbsa.gov.iq]
    Sources
    Federal Board of Supreme AuditDocument, p.303[1]Document, p.304[2]
  2. 25 March 2024BasraLicences, industrial cities and land

    Investment licence No. 222 of the Basra Investment Commission: Al-Rafidain Steel and Iron Manufacturing Plant, Including Reinforcement and Steel Sections

    Investor or partner
    Bab Al-Maqam Co. Ltd. for General Trading, Contracting, Real Estate and Tourism Investments, and Cargo Handling Services (as printed on the Commission's page). Nationality: Iraqi
    شركة باب المقام للتجارة والمقاولات العامة والاستثمار العقاري والاستثمارات السياحية وشحن وتفريغ البضائع محدودة المسؤولية
    Land
    250 dunums. Location as printed in Arabic: القطعة المرقمة 2 /5 مقاطعة 16 كريع الذيب. Land owner: Ministry of Finance.
    Value
    98,021,729,068 IQD (capital of the project, as printed)
    Course of the project
    Posted on the Commission's website on 25 March 2024 as an industrial investment licence. The page gives implementation period Years, investment period Years renewable. The page prints an issue date of 25/3/2026, which differs from the posting date. It does not say why. The page does not say what became of the project.
    Official findings
    None found.
    Wording of the source
    «اسم المستثمر شركة باب المقام للتجارة والمقاولات العامة والاستثمار العقاري والاستثمارات السياحية وشحن وتفريغ البضائع محدودة المسؤولية» [investbasrah.com] … … «أسم المشروع معمل الرافدين لإنتاج حديد التسليح والحديد والصلب والمقاطع الحديدية» [investbasrah.com] … … «رأس مال المشروع 98,021,729,068 دينار عراقي 98.021.729.068» [investbasrah.com]
  3. 12 March 2024Partnership and rehabilitation contracts

    Refined sulphur production line at the Mishraq 1 field

    Investor or partner
    Rafidain Iraq General Trading and Contracting Company
    شركة رافدي العراق للتجارة والمقاولات العامة
    State company
    Mishraq Sulphur State Company, Nineveh
    Terms
    The High Committee for Reconstruction and Investment referred the rehabilitation of the line to the company. Capacity 1.5 million tonnes of refined sulphur a year. In 2026 the state company described this as its first partnership agreement, covering rehabilitation, operation and development. The date is the date of the report.
    Course of the project
    The ministry said the project was one of the opportunities presented at the mining investment conference of May 2023. A second partnership followed in 2026 (next row).
    Official findings
    None found in the sources read.
    Wording of the source
    «has decided to refer the project for rehabilitating the sulphur [sulfur] production line at Al-Mishraq to Rafidain Iraq General Trading and Contracting Company» [iraq-businessnews.com]
  4. 25 January 2024Dhi QarLicences, industrial cities and land

    Dhi Qar Industrial City: fence and facilities, built under four contracts between the Ministry of Industry and Minerals and a state company, in phases

    Investor or partner
    A state company (not named by the Integrity Commission)
    شركة حكومية (لم تسمِّها هيئة النزاهة الاتحادية)
    Land
    Dhi Qar Industrial City, Nasiriyah
    Value
    167,644,805,531 IQD (spent, against an estimated cost of IQD 64,003,809,890)
    Course of the project
    The investigating judge for integrity cases in Dhi Qar decided to ask the Federal Board of Supreme Audit to audit the payments and to ask the ministry to open an administrative investigation. He also ordered the statement of the Rafidain Bank legal representative to be taken. No later outcome was found as of 12 Oct 2026.
    Official findings
    The Integrity Commission said its Dhi Qar team checked the bank statements of the project to build the industrial city fence. It said IQD 167,644,805,531 was spent although the estimated cost was IQD 64,003,809,890. It said the withdrawals from Rafidain Bank, Ur branch, showed that the executing company received IQD 103,640,995,641 more than it was due, measured against the… Read the rest original cost of the project. The Commission named neither the company nor any official. Status of the unnamed state company: under investigation (as of 25 January 2024).
    Wording of the source
    بيَّن تسلم الشركة المنفذة مبالغ أكثر ممَّا تستحقُّ بمقدار (103,640,995,641) مليارات دينارٍ عن التكلفة الأصليَّة للمشروع
  5. 10 January 2023Partnership and rehabilitation contracts

    Abu Ghraib dairy plants (yogurt lines Rafidain, Dijla and Furat)

    Investor or partner
    A local company called Allied, as printed by Iraq Business News
    شركة محلية تُدعى Allied، كما ورد في Iraq Business News
    State company
    State Company for Food Products
    Terms
    Partnership contract to rehabilitate the plants, add new lines and products, and manage the existing lines and machinery. Shares and duration not published. The date is the date of the report.
    Course of the project
    Not found in the sources read.
    Official findings
    None found in the sources read.
    Wording of the source
    «has signing of a partnership contract with a local company called "Allied", to rehabilitate Abu Ghraib dairy factories and add new lines and products.» [iraq-businessnews.com]
  6. 14 October 2019Partnership and rehabilitation contracts

    36 investment projects and contracts signed in 2019, including the Nawra lime plant in Karbala, the paper bag plant at the Rafidain cement plant, the Fallujah white cement plant and the Kufa paper bag plant

    Investor or partner
    Not named in the ministry statement.
    غير مسمّى في بيان الوزارة.
    State company
    State Company for Iraqi Cement, Al-Zawraa State Company, Al-Faris State Company and others
    Terms
    Partnership and investment contracts. The ministry said its companies had more than 190 investment opportunities on offer.
    Course of the project
    The statement said contracts for the Abu Ghraib dairy lines, the dried milk plant, carton boxes and military textile products would follow soon.
    Official findings
    None in the ministry statement.
    Wording of the source
    «هذه العقود شملت عقد انتاج الغازات الطبية والصناعية ومشروع زيادة الطاقة الانتاجية لمصنع الفلاتر في شركة الزوراء العامة وعقود استثمار معمل النورة في محافظة كربلاء المقدسة ومعمل الأكياس الورقية في معمل سمنت الرافدين ومعمل سمنت الفلوجة الأبيض ومعمل الأكياس الورقية في الكوفة والتابعة جميعها إلى الشركة العامة للسمنت العراقية» [alsumaria.tv]
  7. 14 October 2013BasraLicences, industrial cities and land

    Investment licence No. 77 of the Basra Investment Commission: Waterproofing materials plant

    Investor or partner
    RAFIDAIN OIL SERVICE CO. (named on the Commission's later page for licence 77). Nationality in the list: Jordanian
    شركة الرافدين للخدمات البترولية
    Land
    10 dunums
    Value
    9,464,850 USD (the list shows a dollar sign for the first row only. The currency of this row is not stated)
    Course of the project
    Entry 63 of the Commission's list of licensed projects (industrial sector, year of grant 2013). The list gives no later step for the project. The Commission's page for licence 77, posted on 27 January 2020, names the investor and gives the same capital.
    Official findings
    None found.
    Wording of the source
    «اردنية … الصناعي … 9,464,850 … 77 … 2013-10-14» [investbasrah.com] … … «معمل انتاج العوازل المائية» [investbasrah.com] … … «اسم المستثمر شركة الرافدين للخدمات البترولية» [investbasrah.com] … … «رأس مال المشروع 9,464,850 دولار امريكي 9,464,850 $» [investbasrah.com]

Ministers and directors-general

A name here records a public office. It is not an allegation. The legal status is given with its source and its date.
Ministers and directors-general
NamePostTermLegal statusSources
Mohammed Tofiq Rahim
محمد توفيق رحيم
Minister of Industry and Minerals2003
To: 2004
Not charged as of the date of writing
Listed as minister from 2003 to 2004 in the ministry's Arabic encyclopedia entry; exact dates not found. No charge, court ruling, sanction or official finding was found in the sources read. Not charged as of the date of writing (5 Oct 2026).
Document (saved page)Wikipedia (Arabic)
Hajim al-Hasani
حاجم الحسني
Minister of Industry and Minerals2004
To: 2005
Not charged as of the date of writing
Listed as minister from 2004 to 2005; exact dates not found. No charge, court ruling, sanction or official finding was found in the sources read. Not charged as of the date of writing.
Document (saved page)Wikipedia (Arabic)
Usama al-Nujaifi
أسامة النجيفي
Minister of Industry and Minerals2005
To: 2006
Accused in credible reporting
Listed as minister from 2005 to 2006; exact dates not found. No charge, court ruling, sanction or official finding was found in the sources read. Not charged as of the date of writing.
Document (saved page)Wikipedia (Arabic)
Fawzi Hariri
فوزي حريري
Minister of Industry and Minerals20 May 2006
To: December 2010
Not charged as of the date of writing
Status as of 6 Jun 2014: MP Alia Nassif (Parliamentary Integrity Committee) said a company's referral led the Integrity Commission to open 267 cases against the former minister Fawzi Hariri and the then minister Ahmed al-Karbouli. No charge or ruling found.
Document (saved page)Wikipedia (Arabic)Document (saved page)Alsumaria
Ahmad Nasser Dali al-Karbouli
أحمد الكربولي
Minister of Industry and Minerals21 December 2010
To: September 2014
Not charged as of the date of writing
Status as of 6 Jun 2014: MP Alia Nassif called for his trial, said Integrity Commission files sent to the judiciary contain 'clear incrimination' of the minister (her words) and that the investigating judge turned arrest… Read the rest warrants against him into summonses; she cited 267 cases opened against him and his predecessor. In Sep 2013 MP Kamal al-Saadi said the minister admitted corruption files existed but gave no proof of action. No charge sheet or ruling found in credible sources read.
Document (saved page)Wikipedia (Arabic)AlsumariaDocument (saved page)[1]Document (saved page)[2]
Naseer al-Issawi
نصير العيساوي
Minister of Industry and Minerals8 September 2014
To: July 2015
Not charged as of the date of writing
Resigned at the request of the Sadrist Ahrar bloc; replaced by Mohammed al-Darraji, received by the PM in early July 2015 (Iraq Business News). No charge, court ruling, sanction or official finding was found in the sources read. Not charged as of the date of writing.
Document (saved page)Wikipedia (Arabic)Document (saved page)Iraq Business News
Mohammed Sahib al-Daraji (al-Darraji)
محمد صاحب الدراجي
Minister of Industry and MineralsJuly 2015
To: July 2016
Not charged as of the date of writing
Took over from Naseer al-Issawi in July 2015 (Iraq Business News); named as minister in Dec 2015 by Al-Mada. AFP reported on 19 Jul 2016 that the PM accepted the resignation of the industry minister among others (AFP… Read the rest does not name him). Omitted from the Arabic encyclopedia list. No charge, court ruling, sanction or official finding was found in the sources read. Not charged as of the date of writing.
Document (saved page)Iraq Business NewsDocument (saved page)Al-MadaDocument (saved page)SpaceWar
Mohammed Shia al-Sudani
محمد شياع السوداني
Acting Minister of Industry and Minerals14 August 2016
To: 25 October 2018
Accused by an official body
Acting minister while Minister of Labour. On 25 Oct 2016 asked the Integrity Commission to audit the ministry's 170 investment and partnership contracts. In Dec 2018 Kirkuk Cement Company said he had sent its complaint… Read the rest against the Iraqi Cement DG to investigation. No charge, court ruling, sanction or official finding was found in the sources read. Not charged as of the date of writing.
Document (saved page)WikipediaDocument (saved page)Wikipedia (Arabic)AlsumariaDocument (saved page)[1]Document (saved page)[2]
Saleh (Salih) Abdullah al-Jubouri
صالح عبد الله الجبوري
Minister of Industry and Minerals24 October 2018
To: 7 May 2020
Convicted (reported)
Status as of 1 Feb 2023: the Central Anti-Corruption Criminal Court sentenced him in person to one year (Penal Code Art. 331) in the case of a recorded oath to run the ministry on an MP's directions (Shafaq names him;… Read the rest appeal outcome not found). Later, on 6 Apr 2023, an Integrity Commission investigation panel summoned him and his former office director (Art. 331) over approving cement sales at IQD 60,000 a tonne against the official IQD 65,000, a loss put at over IQD 6.5 billion on 1.3 million tonnes (Shafaq News English names him). On 20 May 2020 the Commission announced a summons for an unnamed former minister over DG reshuffles against Cabinet Decision 71 of 2011; no source names him in that case.
Shafaq NewsDocument (saved page)[1]Document (saved page)[2]AlsumariaDocument (saved page)[1]Document (saved page)[2]Document (saved page)964
Manhal Aziz al-Khabbaz
منهل عزيز الخباز
Minister of Industry and Minerals7 May 2020
To: 27 October 2022
Not charged as of the date of writing
Status as of 11 May 2023: the Parliamentary Integrity Committee opened files on him. In 2022 MP Hadi al-Salami filed a complaint with the Public Prosecution; MP Ahmed Abdullah al-Jubouri delivered 24 then 28 files signed… Read the rest by 120 MPs, alleged referral of most plants to unreputable investors, scrap sales and nepotism; the minister denied the scrap allegations and said the MP had other motives (Shafaq, 7 May 2022). No charge or ruling against him found.
AlsumariaDocument (saved page)[1]Document (saved page)[2]Document (saved page)[3]Document (saved page)[4]Document (saved page)[5]Document (saved page)[6]Document (saved page)Shafaq News
Khalid (Khaled) Battal al-Najm
خالد بتال النجم
Minister of Industry and Minerals27 October 2022
To: May 2026
Not charged as of the date of writing
No official accusation found. Social-media claims in mid 2026 were not confirmed; on 30 Jun 2026 a security source told Shafaq News reports of a siege of his house were false. Chaired the Industrial Cities Authority… Read the rest board; reviewed Southern Fertilizers partnership contracts in Mar 2025; former MP Rahim al-Daraji said in Jun 2026 he gave him a file on a fertiliser project. Not charged as of the date of writing.
Shafaq NewsDocument (saved page)[1]Document (saved page)[2]Document (saved page)Iraq Business NewsDocument (saved page)Alsumaria
Mohammed Nuri Ahmed al-Karbouli
محمد نوري الكربولي
Minister of Industry and MineralsMay 2026 (in office by 24 May 2026)
To: in office (Oct 2026)
Not charged as of the date of writing
INA writes his name as محمد نوري أحمد. On 15 Jun 2026 ordered a full review of partnership, rehabilitation and operation contracts and the ministry's investment plan. No charge, court ruling, sanction or official finding… Read the rest was found in the sources read. Not charged as of the date of writing.
Document (saved page)Wikipedia (Arabic)Document (saved page)Iraqi News AgencyDocument (saved page)964
Adel Karim
عادل كريم
Deputy Minister of Industry and Mineralsin post by March 2010
To: not found
Not charged as of the date of writing
Quoted by Reuters (via Iraq Business News) in March 2010 on plans for joint ventures to overhaul about 240 idle factories. Arabic name not seen in an Arabic source read. No charge, court ruling, sanction or official finding was found in the sources read.
Document (saved page)Iraq Business News
Dr Mohammed Hashim Abdul Majeed
محمد هاشم عبد المجيد
Deputy Minister (planning)in post by 12 November 2018
To: not found
Not charged as of the date of writing
On 12 Nov 2018 chaired a meeting with investors in the Karbala, Samawa and Basra cement plants and said the ministry had stopped new investment licences and would rebalance partnership-contract terms. No charge, court ruling, sanction or official finding was found in the sources read.
Iraqi News Agency
Mu'tasim al-Nuaimi
معتصم النعيمي
Deputy Minister for Planningin post by 23 April 2020
To: not found
Not charged as of the date of writing
Named by INA on 23 Apr 2020. No charge, court ruling, sanction or official finding was found in the sources read.
Document (saved page)Iraqi News Agency
Yousif Mohammed Jasim al-Janabi
يوسف محمد جاسم الجنابي
Deputy Minister for Planningin post by December 2021
To: in post on 8 July 2022
Accused by an official body
Status as of 26 May 2022: MP Ahmed Abdullah al-Jubouri accused the minister, this deputy and some DGs of referring most plants to unreputable investors and selling production lines as scrap. On 8 Jul 2022 the Integrity… Read the rest Commission asked the ministry why he had not left office after the Cabinet Secretariat found the extension of his service unlawful. No charge found.
AlsumariaDocument (saved page)[1]Document (saved page)[2]Document (saved page)[3]
Ahmed Abdul Jabbar Ali
أحمد عبد الجبار علي
Deputy Minister for Planningin post by 13 March 2025
To: not found
Not charged as of the date of writing
Named in an English-language report only. No charge, court ruling, sanction or official finding was found in the sources read.
Document (saved page)Iraq Business News
Raed Abdul-Ilah al-Jubouri
رائد عبد الإله الجبوري
Director-General, General Directorate for Industrial Developmentin post on 5 December 2020
To: not found
Not charged as of the date of writing
Said in Dec 2020 that exemptions under Law 20 of 1998 had stopped after a Finance Minister decision under the fiscal deficit law. No charge, court ruling, sanction or official finding was found in the sources read.
Iraqi News Agency
Aziz Nazim Abd
عزيز ناظم عبد
Director-General, General Directorate for Industrial Developmentin post 2021 to 2022 (INA reports Aug 2021 to Sep 2022)
To: not found
Not charged as of the date of writing
On 30 Sep 2022 said more than 300 licences under establishment were granted and about 416 projects completed in 18 months. No charge, court ruling, sanction or official finding was found in the sources read.
Iraqi News Agency
Khalid Sarhan al-Jumaili
خالد سرحان الجميلي
Director-General, General Directorate for Industrial Development (as described by NIRIJ)not found
To: July 2023
Removed from office
Status as of Jul 2023: NIRIJ reports that a ministry decision in July 2023 relieved him after suspicions over approvals for stopped or fictitious plants, following the handover of the fictitious-plants file to the head… Read the rest of the anti-corruption committee. NIRIJ does not attribute wrongdoing to him. Not charged as of the date of writing.
Document (saved page)nirij.org
Dr Ali Ibrahim Janaan
علي إبراهيم جنعان
Director-General, General Directorate for Industrial Developmentin post by 2 May 2024
To: in post on 10 June 2026
Not charged as of the date of writing
Signs the monthly licence statements. No charge, court ruling, sanction or official finding was found in the sources read.
Iraq Business NewsDocument (saved page)[1]Document (saved page)[2]
Haifa Hamid
هيفاء حميد
Head of the Investment Department, Ministry of Industry and Mineralsin post on 18 October 2010
To: not found
Not charged as of the date of writing
Told Reuters (via Iraq Business News) that IQD 800 billion was allocated for 2011 and the public share in partnerships should be limited. Arabic name not seen in an Arabic source read. No charge, court ruling, sanction or official finding was found in the sources read.
Document (saved page)Iraq Business News
Nasser al-Madani
ناصر المدني
Director-General, State Company for Iraqi Cement (2015 to 2016); later Director-General, Technical Department of the Ministry2015 (DG of Iraqi Cement)
To: in post as Technical Department DG on 1 September 2022
Not charged as of the date of writing
Reported death threats in Mar 2016 over the cement import duty. In Sep 2022 described partnership contracts under the Companies Law and the 100 percent investment model. No charge, court ruling, sanction or official finding was found in the sources read.
Document (saved page)Al-MadaThe New Arab
Hussein Mohsen (Obaid) al-Khafaji
حسين محسن الخفاجي
Director-General, State Company for Iraqi Cementin post on 12 November 2018; again in post on 13 December 2023
To: 18 January 2024 (arrest)
Convicted (reported)
Status as of 24 Apr 2024: the Central Anti-Corruption Criminal Court sentenced 'the former DG of the State Company for Iraqi Cement' in person to three years' severe imprisonment and a fine for taking USD 200,000 of a… Read the rest USD 500,000 payment for a board decision referring the Badush plant (Integrity Commission via 964). The statement does not name him; Infoplus named the DG arrested on 18 Jan 2024 as Hussein al-Khafaji, and INA quoted him as DG on 13 Dec 2023. Earlier, in Dec 2018, Kirkuk Cement Company accused him of extortion and bribery. Appeal outcome not found.
Document (saved page)964Document (saved page)InfoPlusDocument (saved page)Iraq Business NewsIraqi News Agency[1][2]Document (saved page)Alsumaria
Ali Salih Hadi al-Attar
علي صالح هادي العطار
Director-General, State Company for Iraqi Cementnot found
To: before 24 August 2021
Convicted (reported)
Status as of 24 Aug 2021: sentenced to six years and a fine of IQD 10 million for bribery and mediation together with businessman Bahaa al-Jurani, whose companies held partnership contracts with ministry companies (court source via Alsumaria; first instance, appeal outcome not found).
Document (saved page)Alsumaria
Zuhair Daoud Ahmad
زهير داود أحمد
Director-General, State Company for Iraqi Cementby 2026 (start not found)
To: in post on 9 August 2026
Not charged as of the date of writing
Quoted in the ministry statement on the Al-Qaim plant run in partnership with Al-Maysara Cement Company. No charge, court ruling, sanction or official finding was found in the sources read.
Document (saved page)Iraq Business NewsDocument (saved page)ncsciraq.gov.iq
Former Director-General, State Company for Iraqi Cement (not named)
مدير عام سابق للشركة العامة للسمنت العراقية (غير مسمّى)
Director-General, State Company for Iraqi Cementnot found
To: not found
Under investigation
Status as of 20 Mar 2023: the Nineveh integrity investigation court issued a summons (Art. 331) over a contract to maintain and rehabilitate two fuel tanks at the Badush plant. The statement does not name the person. Outcome not found.
Document (saved page)964
Abbas Hayal
عباس حيال
Director-General, State Company for Iron and Steel (Basra)not found
To: in post on 26 November 2022
Not charged as of the date of writing
Said in Nov 2022 that he and staff faced targeting, investigation and penalties linked to scrap smuggling interests while pushing the steel plant project. This is his own account; no case against him found.
Document (saved page)Baghdad Today
Ali Shafi Asaad Arzij
علي شافي أسعد ارزيج
Director-General, State Company for Design and Implementation of Industrial Projects and Investments (merged)not found
To: not found
Convicted (reported)
Status as of 5 Jul 2024: Central Anti-Corruption Criminal Court, six years in absentia and repayment of IQD 2.944 billion (unexplained wealth of IQD 1.472 billion plus an equal fine). Earlier: seven years in absentia… Read the rest (Rusafa Criminal Court, Nov 2023, mud-school projects) and seven years in absentia (Mar 2024, waste of IQD 304.5 million on the Nahrawan industrial complex). Arrest warrants issued; described as a fugitive convict.
Baghdad TodayDocument (saved page)[1]Document (saved page)[2]Document (saved page)[3]
Waddah Salah Mohammed Saeed
وضاح صلاح محمد سعيد
Director-General, State Company for Communications and Power (as stated by an MP)2022 (as stated by an MP)
To: not found
Accused by an official body
Status as of 19 May 2022: MP Ahmed al-Jubouri said minister al-Khabbaz, his maternal uncle, appointed him DG. Nepotism allegation by an MP only; no finding found.
Document (saved page)Alsumaria
Abdul Hamid al-Salem
عبد الحميد السالم
Director-General, State Company for Drugs and Medical Appliances, SamarraMay 2022 (re-appointed, per source)
To: not found
Accused in credible reporting
Status as of 13 May 2022: an Alsumaria source said he was accused in corruption cases from his earlier term and still under investigation. In Oct 2022 the Salah al-Din integrity court summoned the company's then DG (not… Read the rest named) and other managers; in May 2024 a former DG (not named) was caught writing an IQD 1 billion cheque for reappointment. The sources do not say whether these refer to him.
Document (saved page)AlsumariaDocument (saved page)Shafaq NewsDocument (saved page)964
Former Director-General, State Company for Drugs and Medical Appliances, Samarra (not named)
مدير عام سابق للشركة العامة لصناعة الأدوية والمستلزمات الطبية، سامراء (غير مسمّى)
Former Director-Generalnot found
To: not found
Arrested
Status as of 19 May 2024: caught in an Integrity Commission sting writing a cheque of IQD 1 billion in return for reappointment as DG (Decision 160 of 1983); referred to the investigating judge. Outcome not found.
Document (saved page)964
Former Director-General, State Company for Glass and Refractories (not named)
مدير عام سابق للشركة العامة للزجاج والحراريات (غير مسمّى)
Former Director-Generalnot found
To: not found
Under investigation
Status as of 20 Nov 2023: the Anbar integrity investigation court summoned him (Art. 331) over the referral of an investment contract for the glass and ceramics plants with a Russian consortium worth USD 7,305,000 (rehabilitation, operation and production sharing). Outcome not found.
Document (saved page)Baghdad Today
Director-General, State Company for Textile and Leather (not named)
المدير العام للشركة العامة للصناعات النسيجية والجلدية (غير مسمّى)
Director-Generalnot found
To: not found
Convicted (reported)
Status as of 12 May 2022: Central Anti-Corruption Criminal Court, two in-person sentences of three years and fines for taking money to award tent supply contracts. A DG of the same company and its legal manager were… Read the rest summoned in Apr 2023 (Art. 331); the sources do not say whether this is the same person.
Document (saved page)AlsumariaDocument (saved page)Shafaq News
Director-General, State Company for Food Products (not named)
المدير العام للشركة العامة للمنتجات الغذائية (غير مسمّى)
Director-Generalnot found
To: not found
Arrested
Status as of 5 Jun 2021: arrest warrant (Art. 340) executed at the company's offices in the case of the pier 11 rehabilitation and operation contract at Umm Qasr. A DG of the company was summoned in Mar 2022 over damaged… Read the rest sugar; the sources do not say whether this is the same person. Outcome not found.
AlsumariaDocument (saved page)[1]Document (saved page)[2]
Director-General, State Company for Hydraulic Industries (not named)
المدير العام للشركة العامة للصناعات الهيدروليكية (غير مسمّى)
Director-Generalnot found
To: 5 October 2023 (arrest)
Convicted (reported)
Status as of 8 Jan 2024: Central Anti-Corruption Criminal Court, six years in person and a fine of IQD 10 million for taking a bribe of IQD 25 million to pass contract cheques. Appeal outcome not found.
Document (saved page)Baghdad TodayDocument (saved page)964
Former Director-General, State Company for Engineering Support (not named)
مدير عام سابق للشركة العامة للدعم الهندسي (غير مسمّى)
Former Director-Generalnot found
To: not found
Convicted (reported)
Status as of 29 Apr 2019: two sentences of seven years each (Art. 340) over credit payments against contract terms and scrap transport contracts; in Feb 2019 the Commission called him a fugitive convict in a scrap sale case. Not named.
AlsumariaDocument (saved page)[1]Document (saved page)[2]
Former Director-General, State Company for Mining Industries (not named)
مدير عام سابق للشركة العامة للصناعات التعدينية (غير مسمّى)
Former Director-Generalnot found
To: not found
Under investigation
Status as of 6 Mar 2023: Rusafa integrity court summons for unexplained wealth of IQD 2.748 billion (Integrity Law Art. 19/second). Outcome not found.
Document (saved page)964
Director-General in the Ministry (company not named)
مدير عام في الوزارة (الشركة غير مسمّاة)
Director-Generalnot found
To: not found
Under investigation
Status as of 4 May 2020: Rusafa integrity court summons (Art. 340) for spending against the instructions and controls on partnership contracts. Outcome not found.
Document (saved page)Alsumaria
Former office director of Minister Saleh al-Jubouri (not named)
المدير السابق لمكتب الوزير صالح الجبوري (غير مسمّى)
Director of the Minister's Office2018 to 2020 (term of the minister)
To: not found
Under investigation
Status as of 6 Apr 2023: summoned with the former minister over cement sales below the official price. Outcome not found.
Document (saved page)964Document (saved page)Shafaq News
Anas Hashim
أنس هاشم
Director-General, Industrial Cities Authorityin post by 10 June 2026
To: in post (latest source)
Not charged as of the date of writing
Named in an English-language report. The Authority's 2021 contract with Al-Yusra is criticised by the audit bureau. No charge, court ruling, sanction or official finding was found in the sources read.
Document (saved page)Iraq Business News