Al-Binaa Company for Building Materials Industry
Investment licence of the Babil Investment Commission, for the project: Brick plant of 120 million bricks.
شركة البناء لصناعة المواد الانشائية
In short
This licence is held by Al-Binaa Company for Building Materials Industry, and was granted in 2014. The holder's documented legal status: "Not charged as of the date of writing".
Legal status
Not charged as of the date of writing
Not charged as of the date of writing. No court ruling, Integrity Commission statement, audit finding, sanctions listing or credible press accusation naming this licensee was found in the sources read. Status as of 1 November 2026.
The licence as listed
The list of licensed projects of the Babil Investment Commission.
- Licensing body
- Babil Investment Commission
- Licence number
- 60/76
- Note
- The Babil Investment Commission published 4 warnings (1 of them final) addressed to this investor, on 17 June 2026, 13 August 2026 and 27 September 2026 (the titles name the investor, not the licence). The Babil Investment Commission published a notice or letter addressed to this investor, on 20 September 2026 (the titles name the investor, not the licence).
- Documents of the licensing body
- The commission's notice on its website: Document (saved page)Original address
- The commission's table: Document, p.3Original address
- The commission's index of circulars and announcements: Document (saved page)Original address
- Sector
- Industry
- Project
- Brick plant of 120 million bricksمعمل طابوق بطاقة إنتاجية قدرها 120 مليون طابوقة
- Licensee
- شركة البناء لصناعة المواد الانشائية
- Licensee's official website
- No official website found (searched 1 November 2026).
- Province
- Babil
- State of the project
- Contract not signed
Who is behind the licensee
company (Iraqi limited company)
The owners and managers were not identified in the sources that were read.
What official and press reports say
- Official findings
- Administrative notice only: the notification of 20 September 2026, which itself names obstacles on the side of the land owning bodies. No court ruling or Integrity Commission finding was found.
- What became of the project
- The national investment licence list (read for this encyclopedia) records licence 60 of 18 October 2015 for a brick plant of 120 million bricks a year, stated cost USD 40,500,000, 0 percent complete, with the obstacle that the land had not been handed over and the contract not signed. The commission's notification of 20 September 2026 says a long time had passed since the licences for the brick plants without the company coming, partly because of obstacles that concern the bodies owning the land, and asks it to come within 30 days to complete the requirements; if not, the steps to withdraw the licences follow under article 28.
- Other contracts with the state
- None found in the sources read.
Sources
- تبليغ الى المستثمر/ شركة البناء لصناعة المواد الانشائية المحدودةoriginal address, Babil Investment Commission (official website), 20 September 2026 Tier A
تبليغ الى المستثمر/ شركة البناء لصناعة المواد الانشائية المحدودة
- تعميم هيئة استثمار بابل 10588 وكتابه (28 تشرين الأول 2026) مع جدول 108 مشاريع مجازة ومستثمريهاoriginal address, Babil Investment Commission (official website), 28 October 2026 Tier A
بالنظر لعدم قيامكم بأبرام العقود الاستثمارية مع هيئتنا بخصوص الاجازات الاستثمارية الممنوحة لكم من قبلنا توجب حضوركم الى هيئتنا خلال مدة (15) يوم لغرض ابرام العقد الاستثماري