People & Institutions
Sarmad and his brother Mustafa, sons of Luay Abd al-Razzaq
Investment licence of the Babil Investment Commission, for the project: Purified water plant.
سرمد واخيه مصطفى ولدا لؤي عبد الرزاق
In short
This licence is held by Sarmad and his brother Mustafa, sons of Luay Abd al-Razzaq, and was granted in 2009. The holder's documented legal status: "Not charged as of the date of writing".
Legal status
Not charged as of the date of writing
Not charged as of the date of writing. No court ruling, Integrity Commission statement, audit finding, sanctions listing or credible press accusation naming this licensee was found in the sources read. The commission's notice 10480 of 24 August 2026 lists this licence among three withdrawn ones; withdrawal is an administrative act and not a finding of wrongdoing. Status as of 2 November 2026.
The licence as listed
The list of licensed projects of the Babil Investment Commission.
- Licensing body
- Babil Investment Commission
- Licence number
- 7
- Date of grant
- 2009 (day not stated)The commission's documents give no date for the grant. It announced the withdrawal on 24 August 2026.
- Note
- The commission announced the withdrawal of this licence on 24 August 2026, yet its table of 28 October 2026 still calls the investors to sign the contract. The Babil Investment Commission published 3 warnings (1 of them final) addressed to this investor about this licence, on 19 January 2026 and 12 March 2026.
- Documents of the licensing body
- The commission's notice on its website: Document (saved page)Original address
- The commission's table: Document, p.2Original address
- The commission's warning of 12 March 2026: Document (saved page)Original address
- The commission's warning of 19 January 2026: Document (saved page)Original address
- The commission's warning of 19 January 2026: Document (saved page)Original address
- Sector
- Industry
- Project
- Purified water plantمعمل انتاج المياه الصحية
- Licensee
- سرمد واخيه مصطفى ولدا لؤي عبد الرزاق
- Province
- Babil
- State of the project
- Withdrawn
- The commission's remarks and obstacles
- سحب إجازة استثمارية
Who is behind the licensee
joint licence of two individuals as printed in the commission's list
| Name | Role | Legal status | Source |
|---|---|---|---|
Sarmad, son of Luay Abd al-Razzaq سرمد (ولد لؤي عبد الرزاق) | Named in the licence for: Purified water plant (licence 7 of 2009 in the commission's table of 108 licences). | Not charged as of the date of writing Not charged as of the date of writing; no charge, warrant or court ruling naming this person was found. Status as of 2 November 2026. | Documentbic.gov.iq |
Mustafa, son of Luay Abd al-Razzaq and brother of Sarmad مصطفى (ولد لؤي عبد الرزاق وأخو سرمد) | Named in the licence for: Purified water plant (licence 7 of 2009 in the commission's table of 108 licences). | Not charged as of the date of writing Not charged as of the date of writing; no charge, warrant or court ruling naming this person was found. Status as of 2 November 2026. | Documentbic.gov.iq |
What official and press reports say
- Official findings
- Administrative only: the commission's notice 10480 lists the licence among the withdrawn ones, and the circular of 28 October 2026 still calls the investors to sign; neither says why. The titles read Sarmad and Luay Abd al-Razzaq, while the licence list names Sarmad and Mustafa, sons of Luay Abd al-Razzaq; the match rests on the likeness of the names. No court ruling, Integrity Commission statement or audit finding was found.
- What became of the project
- Project: Purified water plant. The commission's notice 10480 of 24 August 2026 grants three licences and withdraws three; read from the scanned table, the withdrawn licences include a plant for sanitary water of this holder. The table of 108 licences attached to the commission's circular 10588 of 28 October 2026 still lists licence 7 of 2009 for the same plant and calls the investors to conclude the investment contract within 15 days. The two documents do not explain the difference, and the withdrawal row was read by eye from a scan and should be checked against the image.
- Other contracts with the state
- None found in the sources read.
Sources
- منح اجازات استثمارية وسحب اجازاتoriginal address, Babil Investment Commission (official website), 24 August 2026 Tier A
منح اجازات استثمارية وسحب اجازات
- تعميم هيئة استثمار بابل 10588 وكتابه (28 تشرين الأول 2026) مع جدول 108 مشاريع مجازة ومستثمريهاoriginal address, Babil Investment Commission (official website), 28 October 2026 Tier A
بالنظر لعدم قيامكم بأبرام العقود الاستثمارية مع هيئتنا بخصوص الاجازات الاستثمارية الممنوحة لكم من قبلنا توجب حضوركم الى هيئتنا خلال مدة (15) يوم لغرض ابرام العقد الاستثماري
- الى المستثمر (سرمد ولؤي عبد الرزاق)original address, Babil Investment Commission (official website), 12 March 2026 Tier A
الى المستثمر (سرمد ولؤي عبد الرزاق)
- الى المستثمر (سرمد ولؤي عبد الرزاق )original address, Babil Investment Commission (official website), 19 January 2026 Tier A
الى المستثمر (سرمد ولؤي عبد الرزاق )