Fayd Al-Amara Contracting, General Trading and Oil Services Company LLC and Taj Al-Wisam General Contracting, Real Estate Investment, Oil Services and General Transport Company Ltd
Investment licence of the Baghdad Investment Commission, for the project: Residential complex.
شركة فيض العمارة للمقاولات والتجارة العامة والخدمات النفطية المحدودة المسؤولية شركة تاج الوسام للمقاولات العامة و الاستثمارات العقارية والخدمات النفطية والنقل العام المحدودة
In short
This licence is held by Fayd Al-Amara Contracting, General Trading and Oil Services Company LLC and Taj Al-Wisam General Contracting, Real Estate Investment, Oil Services and General Transport Company Ltd, and was granted in 2013. The holder's documented legal status: "Not charged as of the date of writing". Published sources state 3 links between the holder and a politician, a party, an official or an armed group, set out below. A stated link is not a finding of wrongdoing.
The Baghdad Investment Commission page of 4 December 2022 says its deputy chairman visited the Al-Zaafaran residential project in Al-Zaafaraniya, carried out by the two companies, and describes it as 23 buildings with 2,760 residential units, schools, a health centre, a commercial centre and a mosque. The page gives no completion figure; the licence list gives licence no. 203 of 2013 at 0 per cent (not started). The commission's page of 23 July 2023 lists a complex of the same name under another company (Al-Sabah Contracting for real estate investment) and the Dar Al-Salam complex under Fayd Al-Amara, so it is not certain which Zaafaran project each page means.
Legal status
Not charged as of the date of writing
Not charged as of the date of writing. No official finding, court case, sanctions designation or credible press accusation naming this licensee was found in the sources read. Status as of 19 October 2026.
The licence as listed
- Licensing body
- Baghdad Investment Commission
- Licence number
- 203
- Date of grant
- 2013
- Sector
- Housing
- Project
- Residential complexمجمع سكني
- Licensee
- شركة فيض العمارة للمقاولات والتجارة العامة والخدمات النفطية المحدودة المسؤولية شركة تاج الوسام للمقاولات العامة و الاستثمارات العقارية والخدمات النفطية والنقل العام المحدودة
- Licensee's official website
- No official website found (searched 1 November 2026).
- Province
- Baghdad
- Location
- 4/45 م2 زعفرانية
- Holder of the land
- Ministry of Financeوزارة المالية
- Stated cost
- $153.9 million
- State of the project
- Not started (0% complete)
Who is behind the licensee
The owners and managers were not identified in the sources that were read.
Links stated in published sources
The Baghdad Investment Commission page of 4 December 2022 says its deputy chairman visited the Al-Zaafaran residential project in Al-Zaafaraniya, carried out by the two companies, and describes it as 23 buildings with 2,760 residential units, schools, a health centre, a commercial centre and a mosque. The page gives no completion figure; the licence list gives licence no. 203 of 2013 at 0 per cent (not started). The commission's page of 23 July 2023 lists a complex of the same name under another company (Al-Sabah Contracting for real estate investment) and the Dar Al-Salam complex under Fayd Al-Amara, so it is not certain which Zaafaran project each page means.
كما شملت الجولة زيارة الى مشروع ( الزعفران السكني) المُنفذ من قبل شركتي (فيض العمارة للمقاولات و التجارة العامة و الخدمات النفطية و تاج الوسام للمقاولات و الاستثمارات العقارية) الذي يتكون من (٢٣) بناية بواقع (٢٧٦٠) وحدة سكنية متكاملة الخدمات
The commission's page of 23 July 2023 reports the chairman's tour of the Dar Al-Salam complex of Fayd Al-Amara and other projects. It says the commission will take legal steps under the investment law against investment companies proven to be slow, up to withdrawal of the licence. The page does not say which companies are slow.
( مجمع الزعفران السكني ) لشركةالصباح للمقاولات العامة للإستثمار العقاري و( ومجمع دار السلام السكني ) لشركة فيض العمارة للمقاولات والتجارة العامة
Alsumaria News reported on 18 October 2025 that residents of the Dar Al-Salam residential complex on the Al-Muthanna airport road protested against poor services and poor flats, handed over in 2025 instead of 2023, and appealed to the Prime Minister. One resident spoke of a strong suspicion of corruption in the complex. The report names no company. The commission's page of 23 July 2023 ties this complex to Fayd Al-Amara, whose licence for it is no. 164 of 2012 (Fayd Al-Amara Contracting, General Trading and Oil Services Company LLC). The same complaints appear in a Baghdad Today report of 23 October 2025 cited under Fayd Al-Amara Contracting, General Trading and Oil Services Company LLC. The suspicion is a resident's statement and is not counted as an accusation.
أهالي مجمع دار السلام السكني الواقع على طريق مطار المثنى ببغداد، اليوم السبت، احتجاجا على سوء الخدمات ورداءة الشقق التي تسلموها، فيما
What official and press reports say
- Official findings
- None naming this licensee as at fault. The commission's chairman announced on 22 July 2023 that legal steps would be taken against slow investment companies in general, without naming any. The Integrity Commission's prevention department said in a report on the Baghdad Investment Commission, carried by Alsumaria News on 8 June 2022, that the commission took no deterrent action against slow companies and limited itself to warnings for projects at 0 per cent completion. The report names no company.
- What became of the project
- The Baghdad Investment Commission list records licence no. 203 of 2013, Residential complex, stated cost USD 153,872,524, land owner Ministry of Finance, location 4/45 م2 زعفرانية, completion recorded as 0 per cent (not started). The commission's page of 4 December 2022 describes the Al-Zaafaran project of the two companies. No source opened gives the present state of this licence. The commission's head said in May 2015, as reported by Alsumaria News on 18 May 2015, that 135 investment projects in Baghdad were stalled because suitable land was not allocated, land owners were slow to sign contracts and hand over land, and designs were not approved, and that many sites had encroachers. The statement names no project.
- Other contracts with the state
- The same Fayd Al-Amara company holds Baghdad Investment Commission licence no. 164 of 2012 for the Dar Al-Salam complex (Fayd Al-Amara Contracting, General Trading and Oil Services Company LLC). A company of almost the same name as Taj Al-Wisam holds licence no. 322 of 2015 for the Baghdad Tourist Island (Taj Al-Wisam Real Estate Contracting, Oil Services and General Transport Company).
Sources
- إستثمار بغداد تطلع ميدانيا على إرتفاع نسب إنجاز المشاريع السكنية و الصناعية الإستثمارية في منطقة الزعفرانيةoriginal address, Baghdad Investment Commission (official website), 4 December 2022 Tier A
كما شملت الجولة زيارة الى مشروع ( الزعفران السكني) المُنفذ من قبل شركتي (فيض العمارة للمقاولات و التجارة العامة و الخدمات النفطية و تاج الوسام للمقاولات و الاستثمارات العقارية) الذي يتكون من (٢٣) بناية بواقع (٢٧٦٠) وحدة سكنية متكاملة الخدمات
- إستثمار بغداد : زيارة ميدانية لعدد من المشاريع الإستثمارية وتوجيهات جديدة بالإنذار وسحب إجازات المتلكئينoriginal address, Baghdad Investment Commission (official website), 23 July 2023 Tier A
( مجمع الزعفران السكني ) لشركةالصباح للمقاولات العامة للإستثمار العقاري و( ومجمع دار السلام السكني ) لشركة فيض العمارة للمقاولات والتجارة العامة
- بالصور والفيديو.. "طفح مجاري وتشقق الجدران".. ساكنو مجمع دار السلام يتظاهرون ويناشدون السودانيoriginal address, Alsumaria News, 18 October 2025 Tier D
أهالي مجمع دار السلام السكني الواقع على طريق مطار المثنى ببغداد، اليوم السبت، احتجاجا على سوء الخدمات ورداءة الشقق التي تسلموها، فيما
- "توصيات واقتراحات".. النزاهـة تعلن نتائج زياراتهـا لهيئة استـثمار بغـدادoriginal address, Alsumaria News, 8 June 2022 Tier D
بعدم اتخاذ هيئة استثمار بغداد إجراءاتٍ رادعةٍ بحقِّ الشركات المُتلكِّئة والاكتفاء بتوجيه إنذاراتٍ فقط للمشاريع التي كانت نسبة إنجازها (0%) وتفاوت في فرض بدلات الاستثمار لمشاريع
- استثمار بغداد تكشف عن وجود 135 مشروعاً استثمارياً معطلاً بسبب عدم تخصيص الأراضيoriginal address, Alsumaria News, 18 May 2015 Tier D
عدم تخصيص الاراضي المناسبة للمشاريع الاستثمارية وتأخر الجهة المالكة في توقيع العقود للاراضي وتسليم الاراضي للمستثمرين والمصادقة على المخططات والتصماميم من قبل الجهات المعنية، فضلا عن وجود الكثير من المشاريع على اراض فيها