Al-Mabrouk Construction Contracting Company Ltd

Investment licence of the Baghdad Investment Commission, for the project: Residential complex.

شركة المبروك للمقاولات الانشائية المحدودة

All investment licences

In short

This licence is held by Al-Mabrouk Construction Contracting Company Ltd, and was granted in 2013. The holder's documented legal status: "Not charged as of the date of writing". Published sources state one link between the holder and a politician, a party, an official or an armed group, set out below. A stated link is not a finding of wrongdoing.

The Baghdad Investment Commission page of 11 May 2025 says its chairman visited the Abraj Al-Nakhla residential complex in Bijiya, carried out by Al-Mabrouk Contracting, which had passed 80 per cent completion, with 22 buildings and educational, commercial and recreational facilities. The page gives no licence number. The match with the licence rests on the company name and the district of Bijiya. The licence list, which dates from about 2020, gives 0 per cent for the licence.

Legal status

Not charged as of the date of writing

Not charged as of the date of writing. No official finding, court case, sanctions designation or credible press accusation naming this licensee was found in the sources read. Status as of 19 October 2026.

The licence as listed

The list of licensed projects of the Baghdad Investment Commission.
Licensing body
Baghdad Investment Commission
Licence number
214 أ
Date of grant
2013
Sector
Housing
Project
Residential complex
مجمع سكني
Licensee
شركة المبروك للمقاولات الانشائية المحدودة
Licensee's official website
No official website found (searched 1 November 2026).
Province
Baghdad
Location
23/173 م30 بيجية / جزء
Holder of the land
Ministry of Finance
وزارة المالية
Stated cost
$240 million
State of the project
Not started (0% complete)

Who is behind the licensee

company (Iraqi limited company)

The owners and managers were not identified in the sources that were read.

Links stated in published sources

Each link is attributed to its source. A stated link is not a finding of wrongdoing.
  • The Baghdad Investment Commission page of 11 May 2025 says its chairman visited the Abraj Al-Nakhla residential complex in Bijiya, carried out by Al-Mabrouk Contracting, which had passed 80 per cent completion, with 22 buildings and educational, commercial and recreational facilities. The page gives no licence number. The match with the licence rests on the company name and the district of Bijiya. The licence list, which dates from about 2020, gives 0 per cent for the licence.

    العمل فيها زارَ رئيس الهيئة المهندس دريد الربيعي صباح اليوم السبت الموافق ٢٠٢٥/٥/١٠ مشروع ( مجمع أبراج النخلة السكني ) المُنفذ من قبل شركة ( المبروك للمقاولات الإنشائية المحدودة ) في منطقة البيجية الذي وصل لنسب إنجاز متقدمة بلغت أكثر من ( ٨٠% ) إذ يتكون المشروع من ( ٢٢ ) بناية إضافة الى المنشآت التعليمية والتجارية والترفيهية فيه حيث أثنى الربيعي على عمل إدارة المشروع وإلتزامها بإعتماد المواصفات

    baghdadic.gov.iqoriginal address

What official and press reports say

Official findings
None naming this licensee. The Integrity Commission's prevention department said in a report on the Baghdad Investment Commission, carried by Alsumaria News on 8 June 2022, that the commission took no deterrent action against slow companies and limited itself to warnings for projects at 0 per cent completion. The report names no company.
What became of the project
The Baghdad Investment Commission list records licence no. 214 أ of 2013, Residential complex, stated cost USD 240,000,000, land owner Ministry of Finance, location 23/173 م30 بيجية / جزء, completion recorded as 0 per cent (not started). The licence list gives the same parcel number (23/173 م30 بيجية) for part of the licences of Abnaa Al-Sharq (Abnaa Al-Sharq General Trading, Real Estate and Tourism Investment Company LLC), Rabban Al-Safina (Rabban Al-Safina General Contracting Company Ltd; Rabban Al-Safina General Contracting Company Ltd and Rif Baghdad Company) and a private hospital licence outside this group. The entries may be parts of one parcel. The commission's page of 11 May 2025 describes the Abraj Al-Nakhla complex as over 80 per cent complete. The commission's head said in May 2015, as reported by Alsumaria News on 18 May 2015, that 135 investment projects in Baghdad were stalled because suitable land was not allocated, land owners were slow to sign contracts and hand over land, and designs were not approved, and that many sites had encroachers. The statement names no project.
Other contracts with the state
None found in the sources read.

Sources

  1. إستثمار بغداد : الربيعي يستمر بجولاته الميدانية لزيارة المشاريع الإستثمارية ومتابعة سير العمل فيهاoriginal address, Baghdad Investment Commission (official website), 11 May 2025 Tier A
    العمل فيها زارَ رئيس الهيئة المهندس دريد الربيعي صباح اليوم السبت الموافق ٢٠٢٥/٥/١٠ مشروع ( مجمع أبراج النخلة السكني ) المُنفذ من قبل شركة ( المبروك للمقاولات الإنشائية المحدودة ) في منطقة البيجية الذي وصل لنسب إنجاز متقدمة بلغت أكثر من ( ٨٠% ) إذ يتكون المشروع من ( ٢٢ ) بناية إضافة الى المنشآت التعليمية والتجارية والترفيهية فيه حيث أثنى الربيعي على عمل إدارة المشروع وإلتزامها بإعتماد المواصفات
  2. "توصيات واقتراحات".. النزاهـة تعلن نتائج زياراتهـا لهيئة استـثمار بغـدادoriginal address, Alsumaria News, 8 June 2022 Tier D
    بعدم اتخاذ هيئة استثمار بغداد إجراءاتٍ رادعةٍ بحقِّ الشركات المُتلكِّئة والاكتفاء بتوجيه إنذاراتٍ فقط للمشاريع التي كانت نسبة إنجازها (0%) وتفاوت في فرض بدلات الاستثمار لمشاريع
  3. استثمار بغداد تكشف عن وجود 135 مشروعاً استثمارياً معطلاً بسبب عدم تخصيص الأراضيoriginal address, Alsumaria News, 18 May 2015 Tier D
    عدم تخصيص الاراضي المناسبة للمشاريع الاستثمارية وتأخر الجهة المالكة في توقيع العقود للاراضي وتسليم الاراضي للمستثمرين والمصادقة على المخططات والتصماميم من قبل الجهات المعنية، فضلا عن وجود الكثير من المشاريع على اراض فيها