Iraq's Corruption
People & Institutions

Al-Taamir Al-Asriya General Contracting Company Ltd

Investment licence of the Baghdad Investment Commission, for the project: Summer and winter swimming pool and recreation centres.

شركة التعمير العصرية للمقاولات العامة المحدودة

All investment licences

In short

This licence is held by Al-Taamir Al-Asriya General Contracting Company Ltd, and was granted in 2013. The holder's documented legal status: "Not charged as of the date of writing". Published sources state one link between the holder and a politician, a party, an official or an armed group, set out below. A stated link is not a finding of wrongdoing.

The Baghdad Investment Commission page of 21 June 2021 says the Dijla Village tourist project, with a first class restaurant and an electronic games hall on a riverside site in Al-Arasat, is carried out by Dar Al-Taamir Al-Asriya for General Contracting and had passed 80 per cent. The name differs slightly from the licensee's and the project differs from the swimming pool in the list, so the page may concern a second project of the same company. The page of 15 June 2023 lists a summer and winter swimming pool project of a company called Al-Emarat Al-Asriya among the projects the chairman visited; the name is not the licensee's and the page may concern the licence of Al-Emarat Al-Asriya Trading and General Contracting Company LLC.

Legal status

Not charged as of the date of writing

Not charged as of the date of writing. No official finding, court case, sanctions designation or credible press accusation naming this licensee was found in the sources read. Status as of 19 October 2026.

The licence as listed

The list of licensed projects of the Baghdad Investment Commission.
Licensing body
Baghdad Investment Commission
Licence number
221
Date of grant
2013
Sector
Tourism
Project
Summer and winter swimming pool and recreation centres
مسبح صيفي شتوي ومراكز ترفيهية
Licensee
شركة التعمير العصرية للمقاولات العامة المحدودة
Licensee's official website
No official website found (searched 1 November 2026).
Province
Baghdad
Location
356/821 بتاوين
Holder of the land
Amanat Baghdad (the Baghdad municipality)
امانة بغداد
Stated cost
$20.7 million
State of the project
Under way (88% complete)

Who is behind the licensee

company (Iraqi limited company)

The owners and managers were not identified in the sources that were read.

Links stated in published sources

Each link is attributed to its source. A stated link is not a finding of wrongdoing.
  • The Baghdad Investment Commission page of 21 June 2021 says the Dijla Village tourist project, with a first class restaurant and an electronic games hall on a riverside site in Al-Arasat, is carried out by Dar Al-Taamir Al-Asriya for General Contracting and had passed 80 per cent. The name differs slightly from the licensee's and the project differs from the swimming pool in the list, so the page may concern a second project of the same company. The page of 15 June 2023 lists a summer and winter swimming pool project of a company called Al-Emarat Al-Asriya among the projects the chairman visited; the name is not the licensee's and the page may concern the licence of Al-Emarat Al-Asriya Trading and General Contracting Company LLC.

    الترفيهية سيوفرها مشروع (قرية دجلة السياحي ) الإستثماري الممنوح إجازة في القطاع السياحي والترفيهي من قبل هيئة إستثمار بغداد . المشروع تنفذه شركة دار التعمير العصرية للمقاولات العامة في العرصات على مساحة تجاوزت الـ(6000) م2 وبواقع ثلاثة طوابق حيث بينت الملاكات الهندسية والفنية في الهيئة أن العمل مستمر في المشروع وقد تجاوزت نسب إنجازه الـ(80%) حيث تم الإنتهاء من أعمال الهيكل الإنشائي والهيكل المعدني الخاص

    baghdadic.gov.iqoriginal address

What official and press reports say

Official findings
None found in the sources read.
What became of the project
The Baghdad Investment Commission list records licence no. 221 of 2013, Summer and winter swimming pool and recreation centres, stated cost USD 20,673,522, land owner Amanat Baghdad (the Baghdad municipality), location 356/821 بتاوين, completion recorded as 88 per cent (under way). The licence list gives 88 per cent for the swimming pool project. The commission's page of 21 June 2021 gives over 80 per cent for a different project of a company of almost the same name.
Other contracts with the state
The commission's page of 21 June 2021 names a Dijla Village tourist project of a company of almost the same name.

Sources

  1. مشروع قرية دجلة السياحي نافذة جديدة على القطاع السياحي الإستثماري في العاصمةoriginal address, Baghdad Investment Commission (official website), 21 June 2021 Tier A
    الترفيهية سيوفرها مشروع (قرية دجلة السياحي ) الإستثماري الممنوح إجازة في القطاع السياحي والترفيهي من قبل هيئة إستثمار بغداد . المشروع تنفذه شركة دار التعمير العصرية للمقاولات العامة في العرصات على مساحة تجاوزت الـ(6000) م2 وبواقع ثلاثة طوابق حيث بينت الملاكات الهندسية والفنية في الهيئة أن العمل مستمر في المشروع وقد تجاوزت نسب إنجازه الـ(80%) حيث تم الإنتهاء من أعمال الهيكل الإنشائي والهيكل المعدني الخاص
  2. جولة تفقدية جديدة تنظمها هيئة إستثمار بغداد ورئيسها لمتابعة المشاريع الإستثماريةoriginal address, Baghdad Investment Commission (official website), 15 June 2023 Tier A
    مول وفندق شركة الفوارس ، مشروع مسبح صيفي _ شتوي لشركة الإمارات العصرية ، مشروع ترفيهي لشركة ولاية الحق ، مشروع فندق