Iraq's Corruption
People & Institutions

Ard Al-Khutwa Trading, Contracting and Human Resources Development Company LLC

Investment licence of the Baghdad Investment Commission, for the project: Centres for testing vehicle exhaust emissions and providing the necessary equipment with modern and advanced technology, in coordination with the Ministry of Environment.

شركة ارض الخطوة للتجارة والمقاولات وتنمية الموارد البشرية محدودة المسؤولية

All investment licences

In short

This licence is held by Ard Al-Khutwa Trading, Contracting and Human Resources Development Company LLC, and was granted in 2015. The holder's documented legal status: "Not charged as of the date of writing". Published sources state one link between the holder and a politician, a party, an official or an armed group, set out below. A stated link is not a finding of wrongdoing.

On 25 May 2015 Alsumaria News published a statement of the Ministry of Environment that it would start its project to test the exhaust of generators and vehicles to remove air pollution. The statement names no company.

Legal status

Not charged as of the date of writing

Not charged as of the date of writing. No official finding, court case, sanctions designation or credible press accusation naming this licensee was found in the sources read. Status as of 19 October 2026.

The licence as listed

The list of licensed projects of the Baghdad Investment Commission.
Licensing body
Baghdad Investment Commission
Licence number
319
Date of grant
2015
Sector
Commerce
Project
Centres for testing vehicle exhaust emissions and providing the necessary equipment with modern and advanced technology, in coordination with the Ministry of Environment
مراكز لفحص عوادم السيارات وتوفير الاجهزة اللازمة بتقنية حديثة ومتطورة بالتنسيق مع وزارة البيئة
Licensee
شركة ارض الخطوة للتجارة والمقاولات وتنمية الموارد البشرية محدودة المسؤولية
Licensee's official website
No official website found (searched 1 November 2026).
Province
Baghdad
Holder of the land
Other
أخرى
Stated cost
$14.8 million
State of the project
Under way (80% complete)

Who is behind the licensee

company (Iraqi limited liability company)

The owners and managers were not identified in the sources that were read.

Links stated in published sources

Each link is attributed to its source. A stated link is not a finding of wrongdoing.
  • On 25 May 2015 Alsumaria News published a statement of the Ministry of Environment that it would start its project to test the exhaust of generators and vehicles to remove air pollution. The statement names no company.

    مباشرتها بمشروع فحص عوادم المولدات والمركبات للقضاء على تلوث الهواء. السومرية نيوز/ بغداد اعلنت وزارة البيئة العراقية ،

    alsumaria.tvoriginal address

What official and press reports say

Official findings
None found in the sources read.
What became of the project
The Baghdad Investment Commission list records licence no. 319 of 2015, Centres for testing vehicle exhaust emissions and providing the necessary equipment with modern and advanced technology, in coordination with the Ministry of Environment, stated cost USD 14,833,333, land owner Other, completion recorded as 80 per cent (under way). The list gives no land owner or location for this licence: the land column reads Other and the location is blank. The Ministry of Environment's statement of 25 May 2015 about a scheme to test exhaust emissions names no company.

Sources

  1. البيئة تباشر بمشروع فحص عوادم المولدات والمركبات للقضاء على تلوث الهواءoriginal address, Alsumaria News, 25 May 2015 Tier D
    مباشرتها بمشروع فحص عوادم المولدات والمركبات للقضاء على تلوث الهواء. السومرية نيوز/ بغداد اعلنت وزارة البيئة العراقية ،