Mawarid Al-Khalij Oil Services, Well Drilling and General Transport Company LLC
Investment licence of the Baghdad Investment Commission, for the project: Steel production plant.
شركة موارد الخليج للخدمات النفطية وحفر الابار والنقل العام محدودة المسؤولية
In short
This licence is held by Mawarid Al-Khalij Oil Services, Well Drilling and General Transport Company LLC, and was granted in 2015. The holder's documented legal status: "Not charged as of the date of writing".
Legal status
Not charged as of the date of writing
Not charged as of the date of writing. No official finding, court case, sanctions designation or credible press accusation naming this licensee was found in the sources read. Status as of 19 October 2026.
The licence as listed
The list of licensed projects of the Baghdad Investment Commission.
- Licensing body
- Baghdad Investment Commission
- Licence number
- 271
- Date of grant
- 2015
- Sector
- Industry
- Project
- Steel production plantمعمل انتاج الحديد الصلب
- Licensee
- شركة موارد الخليج للخدمات النفطية وحفر الابار والنقل العام محدودة المسؤولية
- Licensee's official website
- No official website found (searched 1 November 2026).
- Province
- Baghdad
- Location
- 1/42784 م3 نهروان
- Holder of the land
- Ministry of Financeوزارة المالية
- Stated cost
- $235.5 million
- State of the project
- Not started (0% complete)
Who is behind the licensee
company (Iraqi limited liability company)
The owners and managers were not identified in the sources that were read.
What official and press reports say
- Official findings
- None naming this licensee. The Integrity Commission's prevention department said in a report on the Baghdad Investment Commission, carried by Alsumaria News on 8 June 2022, that the commission took no deterrent action against slow companies and limited itself to warnings for projects at 0 per cent completion. The report names no company.
- What became of the project
- The Baghdad Investment Commission list records licence no. 271 of 2015, Steel production plant, stated cost USD 235,530,000, land owner Ministry of Finance, location 1/42784 م3 نهروان, completion recorded as 0 per cent (not started). No source opened describes the plant, its owners or its present state. The commission's head said in May 2015, as reported by Alsumaria News on 18 May 2015, that 135 investment projects in Baghdad were stalled because suitable land was not allocated, land owners were slow to sign contracts and hand over land, and designs were not approved, and that many sites had encroachers. The statement names no project.
- Other contracts with the state
- The same company holds licence no. 249 of 2014 for the Abraj Baghdad residential complex (Mawarid Al-Khalij Oil Services, Well Drilling, General Transport, Real Estate and Tourism Investment Company LLC).
Sources
- "توصيات واقتراحات".. النزاهـة تعلن نتائج زياراتهـا لهيئة استـثمار بغـدادoriginal address, Alsumaria News, 8 June 2022 Tier D
بعدم اتخاذ هيئة استثمار بغداد إجراءاتٍ رادعةٍ بحقِّ الشركات المُتلكِّئة والاكتفاء بتوجيه إنذاراتٍ فقط للمشاريع التي كانت نسبة إنجازها (0%) وتفاوت في فرض بدلات الاستثمار لمشاريع
- استثمار بغداد تكشف عن وجود 135 مشروعاً استثمارياً معطلاً بسبب عدم تخصيص الأراضيoriginal address, Alsumaria News, 18 May 2015 Tier D
عدم تخصيص الاراضي المناسبة للمشاريع الاستثمارية وتأخر الجهة المالكة في توقيع العقود للاراضي وتسليم الاراضي للمستثمرين والمصادقة على المخططات والتصماميم من قبل الجهات المعنية، فضلا عن وجود الكثير من المشاريع على اراض فيها