Khairat Al-Durr Trading, Contracting, General Services and Real Estate Investment Company Ltd

Investment licence of the Baghdad Investment Commission, for the project: Residential complex.

شركة خيرات الدر للتجارة والمقاولات والخدمات العامة والاستثمارات العقارية المحدودة

All investment licences

In short

This licence is held by Khairat Al-Durr Trading, Contracting, General Services and Real Estate Investment Company Ltd, and was granted in 2016. The holder's documented legal status: "Not charged as of the date of writing". Published sources state 5 links between the holder and a politician, a party, an official or an armed group, set out below. A stated link is not a finding of wrongdoing.

964 Media reported on 26 March 2023 that dozens of buyers of Al-Mahabba complex in Al-Saydiya protested at the gate of Khairat Al-Durr at Al-Darwish junction, demanding delivery of the second batch of flats. The report says the company was more than three years past the contract period, that one protester accused it of spending buyers' payments on building another complex, and that a company representative promised a new timetable. The protesters asked the Integrity Commission and the Baghdad Investment Commission to act. One buyer said she had sued the company and the case was before the courts.

Legal status

Not charged as of the date of writing

Not charged as of the date of writing. 964 Media, a credible news outlet, reported on 11 January 2024 that the chairman of the company faces court rulings. It did not say what the rulings are, which court issued them or when, and no court ruling, charge or warrant naming the company or its owner was found. Buyers' complaints of delay and demands for refunds, and the commission's announcement of 11 August 2024 that the licence of Al-Mahabba complex was withdrawn (which names no company), are recorded as facts and are not counted as an accusation.

The licence as listed

The list of licensed projects of the Baghdad Investment Commission.
Licensing body
Baghdad Investment Commission
Licence number
233
Date of grant
2016
Sector
Housing
Project
Residential complex
مجمع سكني
Licensee
شركة خيرات الدر للتجارة والمقاولات والخدمات العامة والاستثمارات العقارية المحدودة
Licensee's official website
No official website found (searched 1 November 2026).
Province
Baghdad
Location
43/14974 م1 الخر
Holder of the land
Amanat Baghdad (the Baghdad municipality)
امانة بغداد
Stated cost
$48.8 million
State of the project
Under way (40% complete)

Who is behind the licensee

company (Iraqi limited liability company)
People connected with the licensee
NameRoleLegal statusSource
Nizar Abdul Wahid
نزار عبد الواحد
Owner of Khairat Al-Durr, according to NIRIJ (30 April 2025)Not charged as of the date of writing
Not charged as of the date of writing. NIRIJ names him as the owner. No ruling, charge or warrant naming him was found. Status as of 19 October 2026.
Document (saved page)nirij.org

Links stated in published sources

Each link is attributed to its source. A stated link is not a finding of wrongdoing.
  • 964 Media reported on 26 March 2023 that dozens of buyers of Al-Mahabba complex in Al-Saydiya protested at the gate of Khairat Al-Durr at Al-Darwish junction, demanding delivery of the second batch of flats. The report says the company was more than three years past the contract period, that one protester accused it of spending buyers' payments on building another complex, and that a company representative promised a new timetable. The protesters asked the Integrity Commission and the Baghdad Investment Commission to act. One buyer said she had sued the company and the case was before the courts.

    شراء وحدات سكنية في مشروع مجمع المحبة السكني، قد نظموا وقفة صباح السبت، أمام بوابة شركة خيرات الدر في تقاطع الدرويش بمنطقة السيدية، للمطالبة بتسليم شققهم ضمن الوجبة

    964media.comoriginal address

  • 964 Media reported on 11 January 2024 that buyers in Al-Mahabba 2 were again protesting that delivery was more than a year late and asking for their money back. The report says Al-Mahabba 2 is carried out by the company, "whose board chairman faces court rulings", and that the legal problems affected completion of its first project. A buyer said the project owner was sentenced by a court. The report does not name the chairman, the court or the rulings, and does not say whether they are civil or criminal.

    أسرع منصاتنا التفاصيل: مجمّع المحبة 2 تنفّذه شركة خيرات الدار، التي يواجه رئيس مجلس إدارتها أحكاماً قضائية.

    964media.comoriginal address

  • NIRIJ reported on 30 April 2025 that Khairat Al-Durr is owned by the investor Nizar Abdul Wahid and carries out Al-Mahabba 1 in Al-Saydiya. A buyer who signed in 2019 told NIRIJ the flat was not finished on time and that the company was then given a new project, Al-Mahabba 2, at Al-Darwish junction. She asked the Prime Minister to replace the company. NIRIJ names no ruling against the owner.

    شركة (خيرات الدر) المملوكة للمستثمر نزار عبد الواحد، والتي تنفذ (مجمع المحبة السكني 1) في منطقة السيدية ببغداد، إذ وقعت على

    nirij.orgoriginal address

  • Mawazin News reported on 11 August 2024 that a commission official announced the withdrawal of the investment licence of the Abu Al-Fadl residential complex, the Al-Zuhur residential complex and Al-Mahabba complex. The report names no company. Both Al-Mahabba complexes are tied to Khairat Al-Durr by the commission's own pages and by NIRIJ, so the withdrawal probably concerns this company, but no source states it.

    والمخالفين". وكشف عن "سحب إجازة الاستثمار لمشروع مجمع أبو الفضل السكني الواقع في منطقة الحسينية وكذلك مجمع الزهور السكني وأيضاً مجمع المحبة". اخبار ذات الصلة التعليم تعلن نتائج

    mawazin.netoriginal address

  • The Baghdad Investment Commission page of 21 May 2023 lists Al-Mahabba 1 and Al-Mahabba 2 of the company among the projects its chairman visited, and says he found shortfalls and delay in some of the projects listed and ordered final warnings. The page does not say which. The page of 25 November 2023 reports a visit to Al-Mahabba 2 of the company.

    مجمع المحبة (١) ومجمع المحبة (٢) لشركة خيرات الدر للتجارة والمقاولات والخدمات العامة ، مجمع زهراء السيدية لشركة سه كرمه

    baghdadic.gov.iqoriginal address

What official and press reports say

Official findings
Baghdad Investment Commission: the chairman's tour of 21 May 2023 noted delay in some of the projects listed, among them the company's two complexes, and ordered final warnings (the page does not say which projects). A commission official told Mawazin News on 11 August 2024 that the licence of Al-Mahabba complex was withdrawn. No court ruling, Integrity Commission statement or audit finding naming the company was found.
What became of the project
The Baghdad Investment Commission list records licence no. 233 of 2016, Residential complex, stated cost USD 48,803,488, land owner Amanat Baghdad (the Baghdad municipality), location 43/14974 م1 الخر, completion recorded as 40 per cent (under way). The list gives this licence as a residential complex in Al-Khur. The commission's pages and the press tie the company to the Al-Mahabba 1 and 2 complexes in Al-Saydiya, but they give no licence numbers, so the match of this licence with one of the two rests on the company name and the district. The licence list's parcel 43/14974 م1 الخر is also given for the Al-Saydiya amusement park licence of Al-Karkh Amusement Park Tourism Company.
Other contracts with the state
The same company holds licence no. 290 of 2017 for a vertical residential complex (Khairat Al-Durr Trading, General Contracting and General Services Company LLC). The company's Al-Mahabba 1 and Al-Mahabba 2 complexes are in Al-Saydiya.

Sources

  1. السيدية: المشترون في مجمّع “المحبة 2” يجددون احتجاجهم.. نريد أموالنا من الشركةoriginal address, 964 Media, 11 January 2024 Tier D
    أسرع منصاتنا التفاصيل: مجمّع المحبة 2 تنفّذه شركة خيرات الدار، التي يواجه رئيس مجلس إدارتها أحكاماً قضائية.
  2. بعد وقفة شملت فنانين.. مجمع “المحبة” السكني في السيدية يعد بتسليم الشقق المتلكئةoriginal address, 964 Media, 26 March 2023 Tier D
    شراء وحدات سكنية في مشروع مجمع المحبة السكني، قد نظموا وقفة صباح السبت، أمام بوابة شركة خيرات الدر في تقاطع الدرويش بمنطقة السيدية، للمطالبة بتسليم شققهم ضمن الوجبة
  3. مشاريع الاستثمار المتلكئة في العراق: تفاقم أزمة السكن بدلا من حلها!original address, NIRIJ (Network of Iraqi Reporters for Investigative Journalism), 30 April 2025 Tier D
    شركة (خيرات الدر) المملوكة للمستثمر نزار عبد الواحد، والتي تنفذ (مجمع المحبة السكني 1) في منطقة السيدية ببغداد، إذ وقعت على
  4. مشاريع الاستثمار المتلكئة في العراق: تفاقم أزمة السكن بدلا من حلها!original address, NIRIJ (Network of Iraqi Reporters for Investigative Journalism), 30 April 2025 Tier D
    منحت الشركة مشروعاً جديداً باسم مجمع المحبة السكني 2 في تقاطع الدرويش ببغداد!”. هي
  5. استثمار بغداد تعلن سحب اجازات ثلاثة مجمعات سكنية في العاصمةoriginal address, Mawazin News, 11 August 2024 Tier D
    والمخالفين". وكشف عن "سحب إجازة الاستثمار لمشروع مجمع أبو الفضل السكني الواقع في منطقة الحسينية وكذلك مجمع الزهور السكني وأيضاً مجمع المحبة". اخبار ذات الصلة التعليم تعلن نتائج
  6. إستثمار بغداد : المهندس الحسن جميل يستمر بجولاته التفقدية لزيارة المشاريع الإستثمارية ومتابعة سير العمل فيهاoriginal address, Baghdad Investment Commission (official website), 21 May 2023 Tier A
    مجمع المحبة (١) ومجمع المحبة (٢) لشركة خيرات الدر للتجارة والمقاولات والخدمات العامة ، مجمع زهراء السيدية لشركة سه كرمه
  7. إستثمار بغداد : المهندس الحسن جميل يستمر بجولاته التفقدية لزيارة المشاريع الإستثمارية ومتابعة سير العمل فيهاoriginal address, Baghdad Investment Commission (official website), 21 May 2023 Tier A
    شخصَ وجود تقصير وتلكؤ في إنجاز البعض منها بحسب جدول تقدم العمل المُعد لها . كما
  8. إستثمار بغداد : جولة ميدانية جديدة يجريها رئيس هيئة إستثمار بغداد إلى عدد من المشاريع الإستثماريةoriginal address, Baghdad Investment Commission (official website), 25 November 2023 Tier A
    زار مشروع ( مجمع المحبة السكني ٢) الذي تُنفذه شركة ( خيرات الدر للتجارة والمقاولات العامة ) وقد حث الحسن جميل إدارات هذه