Al-Fath Engineering General Contracting Company

Investment licence of the Baghdad Investment Commission, for the project: Al-Fatih residential city.

شركة الفتح الهندسية للمقاولات العامة

All investment licences

In short

This licence is held by Al-Fath Engineering General Contracting Company, and was granted in 2010. The holder's documented legal status: "Not charged as of the date of writing".

Legal status

Not charged as of the date of writing

Not charged as of the date of writing. No official finding, court case, sanctions designation or credible press accusation naming this licensee was found in the sources read. Status as of 19 October 2026.

The licence as listed

The list of licensed projects of the Baghdad Investment Commission.
Licensing body
Baghdad Investment Commission
Licence number
79
Date of grant
2010
Sector
Housing
Project
Al-Fatih residential city
مدينة الفاتح السكنية
Licensee
شركة الفتح الهندسية للمقاولات العامة
Licensee's official website
No official website found (searched 1 November 2026).
Province
Baghdad
Location
1/43625 م3 نهروان
Holder of the land
Baghdad Governorate Municipalities Directorate
مديرية بلديات محافظة بغداد
Stated cost
$120 million
State of the project
Not started (0% complete)

Who is behind the licensee

company (Iraqi company)

The owners and managers were not identified in the sources that were read.

What official and press reports say

Official findings
None found in the sources read.
What became of the project
The Baghdad Investment Commission list records licence no. 79 of 2010, Al-Fatih residential city, stated cost USD 120,000,000, land owner Baghdad Governorate Municipalities Directorate, location 1/43625 م3 نهروان, completion recorded as 0 per cent (not started). The Baghdad Investment Commission page of 24 November 2022 describes Al-Fatah City as built on 127 dunums at Nahrawan in the Mada'in district, with 700 two-storey units of 200 square metres, shops, a bank, a fuel station and schools, and says the first phase had passed 51 per cent. The commission chairman visited it on 7 October 2023 and told the staff to speed up the work and to review the obstacles. The list's figure of 0 per cent does not match the commission's reports.
Other contracts with the state
None found in the sources read.

Sources

  1. إستثمار بغداد تطلع ميدانيا على تطور مراحل العمل وإرتفاع نسب إنجاز المشاريع السكنية الإستثمارية في أطراف العاصمة بغدادoriginal address, Baghdad Investment Commission (official website), 25 November 2022 Tier A
    مدينة الفاتح السكنية ) المنفذة من قبل ( شركة الفتح الهندسية للمقاولات العامة ) الكائنة في النهروان / قضاء للمدائن والمقامة على مساحة ( ١٢٧ ) دونم
  2. إستثمار بغداد : خلال جولة تفقدية .. الحسن جميل يتابع عمل عدد من المشاريع الإستثماريةoriginal address, Baghdad Investment Commission (official website), 8 October 2023 Tier A
    كما زار الحسن مشروع مدينة الفاتح السكنية وتابع عن كثب مراحل عمل المشروع ايضاً وجه ملاكاته برفع وتيرة العمل لإنجازه