Al-Fath Engineering General Contracting Company
Investment licence of the Baghdad Investment Commission, for the project: Al-Fatih residential city.
شركة الفتح الهندسية للمقاولات العامة
In short
This licence is held by Al-Fath Engineering General Contracting Company, and was granted in 2010. The holder's documented legal status: "Not charged as of the date of writing".
Legal status
Not charged as of the date of writing
Not charged as of the date of writing. No official finding, court case, sanctions designation or credible press accusation naming this licensee was found in the sources read. Status as of 19 October 2026.
The licence as listed
The list of licensed projects of the Baghdad Investment Commission.
- Licensing body
- Baghdad Investment Commission
- Licence number
- 79
- Date of grant
- 2010
- Sector
- Housing
- Project
- Al-Fatih residential cityمدينة الفاتح السكنية
- Licensee
- شركة الفتح الهندسية للمقاولات العامة
- Licensee's official website
- No official website found (searched 1 November 2026).
- Province
- Baghdad
- Location
- 1/43625 م3 نهروان
- Holder of the land
- Baghdad Governorate Municipalities Directorateمديرية بلديات محافظة بغداد
- Stated cost
- $120 million
- State of the project
- Not started (0% complete)
Who is behind the licensee
company (Iraqi company)
The owners and managers were not identified in the sources that were read.
What official and press reports say
- Official findings
- None found in the sources read.
- What became of the project
- The Baghdad Investment Commission list records licence no. 79 of 2010, Al-Fatih residential city, stated cost USD 120,000,000, land owner Baghdad Governorate Municipalities Directorate, location 1/43625 م3 نهروان, completion recorded as 0 per cent (not started). The Baghdad Investment Commission page of 24 November 2022 describes Al-Fatah City as built on 127 dunums at Nahrawan in the Mada'in district, with 700 two-storey units of 200 square metres, shops, a bank, a fuel station and schools, and says the first phase had passed 51 per cent. The commission chairman visited it on 7 October 2023 and told the staff to speed up the work and to review the obstacles. The list's figure of 0 per cent does not match the commission's reports.
- Other contracts with the state
- None found in the sources read.
Sources
- إستثمار بغداد تطلع ميدانيا على تطور مراحل العمل وإرتفاع نسب إنجاز المشاريع السكنية الإستثمارية في أطراف العاصمة بغدادoriginal address, Baghdad Investment Commission (official website), 25 November 2022 Tier A
مدينة الفاتح السكنية ) المنفذة من قبل ( شركة الفتح الهندسية للمقاولات العامة ) الكائنة في النهروان / قضاء للمدائن والمقامة على مساحة ( ١٢٧ ) دونم
- إستثمار بغداد : خلال جولة تفقدية .. الحسن جميل يتابع عمل عدد من المشاريع الإستثماريةoriginal address, Baghdad Investment Commission (official website), 8 October 2023 Tier A
كما زار الحسن مشروع مدينة الفاتح السكنية وتابع عن كثب مراحل عمل المشروع ايضاً وجه ملاكاته برفع وتيرة العمل لإنجازه