Iraq's Corruption
People & Institutions

Fayd Al-Amara Contracting, General Trading and Oil Services Company LLC

Investment licence of the Baghdad Investment Commission, for the project: Residential complex.

شركة فيض العمارة للمقاولات والتجارة العامة والخدمات النفطية محدودة المسؤولية

All investment licences

In short

This licence is held by Fayd Al-Amara Contracting, General Trading and Oil Services Company LLC, and was granted in 2012. The holder's documented legal status: "Not charged as of the date of writing". Published sources state one link between the holder and a politician, a party, an official or an armed group, set out below. A stated link is not a finding of wrongdoing.

Baghdad Today reported on 23 October 2025 that residents of the Dar Al-Salam residential complex on the Muthanna airport road protested over cracks, water leaks, sewage overflow and poor services, handed over two years late, and spoke of suspicions of corruption in the execution contracts and of design changes made without the investment authority's knowledge. The report does not name the company, the licence, or any individual. The commission's page of 23 July 2023 attributes a Dar Al-Salam complex to this company, and a different page attributes an Al-Salam complex to Sarh Al-Bilad (Sarh Al-Bilad Contracting and General Trading Company Ltd). The match is by name only and is not established.

Legal status

Not charged as of the date of writing

Not charged as of the date of writing. No official finding, court case, sanctions designation or credible press accusation naming this licensee was found in the sources read. Status as of 19 October 2026.

The licence as listed

The list of licensed projects of the Baghdad Investment Commission.
Licensing body
Baghdad Investment Commission
Licence number
164
Date of grant
2012
Sector
Housing
Project
Residential complex
مجمع سكني
Licensee
شركة فيض العمارة للمقاولات والتجارة العامة والخدمات النفطية محدودة المسؤولية
Licensee's official website
No official website found (searched 1 November 2026).
Province
Baghdad
Location
23/7 م30 بيجية
Holder of the land
Ministry of Finance
وزارة المالية
Stated cost
$190 million
State of the project
Under way (5% complete)

Who is behind the licensee

company (Iraqi limited liability company)

The owners and managers were not identified in the sources that were read.

Links stated in published sources

Each link is attributed to its source. A stated link is not a finding of wrongdoing.
  • Baghdad Today reported on 23 October 2025 that residents of the Dar Al-Salam residential complex on the Muthanna airport road protested over cracks, water leaks, sewage overflow and poor services, handed over two years late, and spoke of suspicions of corruption in the execution contracts and of design changes made without the investment authority's knowledge. The report does not name the company, the licence, or any individual. The commission's page of 23 July 2023 attributes a Dar Al-Salam complex to this company, and a different page attributes an Al-Salam complex to Sarh Al-Bilad (Sarh Al-Bilad Contracting and General Trading Company Ltd). The match is by name only and is not established.

    يتحول مشروع مجمع دار السلام السكني على طريق مطار المثنى في بغداد من حلمٍ سكني راقٍ إلى كابوسٍ عمراني

    baghdadtoday.newsoriginal address

What official and press reports say

Official findings
None found in the sources read.
What became of the project
The Baghdad Investment Commission list records licence no. 164 of 2012, Residential complex, stated cost USD 190,000,000, land owner Ministry of Finance, location 23/7 م30 بيجية, completion recorded as 5 per cent (under way). The commission's chairman visited the company's Dar Al-Salam complex on 22 July 2023, in a tour that ended with new warnings and threats to withdraw licences from slow companies. No source opened gives the present state of the licence at issue.
Other contracts with the state
The commission's page of 4 December 2022 names the company with Taj Al-Wisam Contracting and Real Estate Investment as executors of the Al-Zaafaran residential complex at Al-Zaafaraniya (23 buildings, 2,760 units). The commission's page of 23 July 2023 lists Al-Zaafaran complex under a company called Al-Sabah (possibly Dar Al-Sabah, Dar Al-Sabah General Contracting and Real Estate Investment Company Ltd) and lists "Dar Al-Salam residential complex" under Fayd Al-Amara. The pages therefore disagree on who holds Al-Zaafaran.

Sources

  1. إستثمار بغداد تطلع ميدانيا على إرتفاع نسب إنجاز المشاريع السكنية و الصناعية الإستثمارية في منطقة الزعفرانيةoriginal address, Baghdad Investment Commission (official website), 4 December 2022 Tier A
    الزعفران السكني) المُنفذ من قبل شركتي (فيض العمارة للمقاولات و التجارة العامة و الخدمات النفطية و تاج الوسام للمقاولات و الاستثمارات العقارية)
  2. إستثمار بغداد : زيارة ميدانية لعدد من المشاريع الإستثمارية وتوجيهات جديدة بالإنذار وسحب إجازات المتلكئينoriginal address, Baghdad Investment Commission (official website), 23 July 2023 Tier A
    لشركة فيض العمارة للمقاولات والتجارة العامة
  3. هبوط حاد بأسعار الوحدات السكنية في مجمع دار السلام بعد تحذيرات من انهيار وشيك للبناياتoriginal address, Baghdad Today (Baghdad Al-Yawm), 23 October 2025 Tier D
    يتحول مشروع مجمع دار السلام السكني على طريق مطار المثنى في بغداد من حلمٍ سكني راقٍ إلى كابوسٍ عمراني