First Iraqi Engineering Consultancy, Car Rental, Heavy Equipment, Maintenance and Engineering Inspection Company LTD

Investment licence of the Basra Investment Commission, for the project: Al-Dar Residential Complex.

شركة أوائل العراق للاستشارات الهندسية و تأجير السيارات والمعدات الثقيلة وصيانتها والفحص الهندسي محدودة المسؤولية

All investment licences

In short

This licence is held by First Iraqi Engineering Consultancy, Car Rental, Heavy Equipment, Maintenance and Engineering Inspection Company LTD, and was granted in 2023. The holder's documented legal status: "Not charged as of the date of writing".

Legal status

Not charged as of the date of writing

Not charged as of the date of writing. No official finding, court case, sanctions designation or credible press accusation naming this licence holder was found in the sources read. Status as of 1 November 2026.

The licence as listed

The list of licensed projects of the Basra Investment Commission.
Licensing body
Basra Investment Commission
Licence number
145
Date of grant
27 August 2023
As the commission's table gives it. The licence's page on the commission's website is dated 27 August 2022.
Documents of the licensing body
Sector
Housing
Project
Al-Dar Residential Complex
مجمع الدار السكني
Licensee
شركة أوائل العراق للاستشارات الهندسية و تأجير السيارات والمعدات الثقيلة وصيانتها والفحص الهندسي محدودة المسؤولية (Iraqi)
Licensee's official website
No official website found (searched 1 November 2026).
Province
Basra
Location
10/20542 مقاطعة 28 البيبان
Holder of the land
Shatt al-Arab Municipality Directorate
مديرية بلدية شط العرب
Area
49 dunums and 75 square metres
Stated cost
$42.3 million
The list gives the cost in dinars. It is converted here at 1,190 dinars to the dollar.
State of the project
Not reported

Who is behind the licensee

company (Iraqi limited liability company for engineering consultancy, rental of cars and heavy equipment, maintenance and engineering inspection)

The owners and managers were not identified in the sources that were read.

What official and press reports say

Official findings
None found in the sources read.
What became of the project
The Basra Investment Commission list records 3 licences for this holder: licence no. 145 of 27 August 2023, Al-Dar Residential Complex, stated capital IQD 50,392,859,476, land owner Shatt al-Arab Municipality Directorate, area 49 donums and 75 square metres, location 10/20542 مقاطعة 28 البيبان; licence no. 219 of 24 March 2026, DAMMAN RESIDENTIAL CITY 3, stated capital IQD 319,541,933,625, land owner Ministry of Finance, area 1000 donums, location القطعة المرقمة 3/1 مقاطعة 26 الصبخ والبور; licence no. 220 of 24 March 2026, DAMMAN RESIDENTIAL CITY 4, stated capital IQD 319,562,533,625, land owner Ministry of Finance, area 1000 donums, location القطعة المرقمة 4/1 مقاطعة 26 الصبخ والبور. The dates are as printed in the list; for several licences the page that carries the licence bears an earlier date. The list records no completion figures for these licences. The two Dhaman residential city licences cover 2,000 donums of Ministry of Finance land between them; with the two held by Maharat Al-Emar the Dhaman city covers 4,000 donums. No source was found on the Dhaman city or the Al-Dar complex, or on their progress.
Other contracts with the state
None found in the sources read. The other two Dhaman residential city licences (nos. 1 and 2, 1,000 donums each of Ministry of Finance land in the same area) are held by Maharat Al-Emar for Contracting and General Trading Company.