Ardh Al-Maidan Oil Services, General Contracting and General Trading Company Ltd.75% & Al-Qawl Al-Sadeed Contracting, General Trading & Public Transport Co. Ltd.25%
Investment licence of the Basra Investment Commission, for the project: AL-Noor Residential Complex.
شركة ارض الميدان للخدمات النفطية والمقاولات والتجارة العامة المحدودة 75% وشركة القول السديد للمقاولات والتجارة العامة والنقل العام محدودة المسؤولية 25%
In short
This licence is held by Ardh Al-Maidan Oil Services, General Contracting and General Trading Company Ltd.75% & Al-Qawl Al-Sadeed Contracting, General Trading & Public Transport Co. Ltd.25%, and was granted in 2026. The holder's documented legal status: "Not charged as of the date of writing".
Legal status
Not charged as of the date of writing
Not charged as of the date of writing. No official finding, court case, sanctions designation or credible press accusation naming this licence holder was found in the sources read. Status as of 1 November 2026.
The licence as listed
- Licensing body
- Basra Investment Commission
- Licence number
- 240
- Date of grant
- 5 April 2026As the commission's table gives it. The licence's page on the commission's website is dated 5 April 2024.
- Documents of the licensing body
- The licence's page on its website: Document (saved page)Original address
- Sector
- Housing
- Project
- AL-Noor Residential Complexمجمع النور السكني
- Licensee
- شركة ارض الميدان للخدمات النفطية والمقاولات والتجارة العامة المحدودة 75% وشركة القول السديد للمقاولات والتجارة العامة والنقل العام محدودة المسؤولية 25% (Iraqi)
- Licensee's official website
- No official website found (searched 1 November 2026).
- Province
- Basra
- Location
- 2393/845 الرباط الكبير
- Holder of the land
- Basra Municipality Directorateمديرية بلدية البصرة
- Area
- 35 dunums and 1 olks
- Stated cost
- $101.3 millionThe list gives the cost in dinars. It is converted here at 1,190 dinars to the dollar.
- State of the project
- Not reported
Who is behind the licensee
The owners and managers were not identified in the sources that were read.
What official and press reports say
- Official findings
- None found in the sources read.
- What became of the project
- The Basra Investment Commission list records 1 licence for this holder: licence no. 240 of 5 April 2026, AL-Noor Residential Complex, stated capital IQD 120,586,520,000, land owner Basra Municipality Directorate, area 35 donums and 1 olk, location 2393/845 الرباط الكبير. The dates are as printed in the list; for several licences the page that carries the licence bears an earlier date. The list records no completion figures for these licences. The Al-Noor complex covers 35 donums and 1 olk of Basra Municipality land on plot 2393/845 in al-Ribat al-Kabir. Two other licences in the list carry plot numbers from 2393 in al-Ribat al-Kabir: the Al-Naseem residential complex (2/2393, 239 donums, 25 January 2023) of Ard Al-Maidan Company for Engineering Services and General Contracting, and the Al-Farah residential complex (2393/3 and 6, 265 donums, 4 December 2012) of Ahmed Shakir Hammood Lazim. The list does not say how these plots relate to one another. No source was found on the Al-Noor complex or on its progress.
- Other contracts with the state
- Ardh Al-Maidan Oil Services, General Contracting and General Trading holds in its own name the licence for the Bawabat Al-Nakhil residential complex of 31 March 2026 (165 donums of Ministry of Finance land). A company with a similar name, Ard Al-Maidan Company for Engineering Services and General Contracting, holds three Basra licences, among them the Al-Naseem residential complex of 2023. The sources read do not say how the two Ard Al-Maidan companies are related. No contract of Al-Qawl Al-Sadeed was found.
Sources
- أهالي مجمع النسيم في البصرة يحتجون: دفعنا كامل المبالغ ونرفض دفع 100 مليون إضافيةoriginal address, Alsumaria News, 18 September 2026 Tier D
مطالبتهم من قبل شركة أخرى تُدعى “أرض الميدان” بدفع مبلغ إضافي قدره 100 مليون دينار