Iraq's Corruption
People & Institutions

Al Shams Company For Limited Construction Industries

Investment licence of the Basra Investment Commission, for the project: Thermiston factory.

شركة الشمس للصناعات الانشائية المحدودة

All investment licences

In short

This licence is held by Al Shams Company For Limited Construction Industries, and was granted in 2014. The holder's documented legal status: "Not charged as of the date of writing".

Legal status

Not charged as of the date of writing

Not charged as of the date of writing. No official finding, court case, sanctions designation or credible press accusation naming this licence holder was found in the sources read. Status as of 1 November 2026.

The licence as listed

The list of licensed projects of the Basra Investment Commission.
Licensing body
Basra Investment Commission
Licence number
84
Date of grant
19 March 2014
Documents of the licensing body
Sector
Industry
Project
Thermiston factory
معمل الثرمستون
Licensee
شركة الشمس للصناعات الانشائية المحدودة (Iraqi)
Licensee's official website
No official website found (searched 1 November 2026).
Province
Basra
Location
32، مقاطعة 43/ الاركلي الشمالي
Area
10 dunums
Stated cost
$11.3 million
State of the project
Not reported

Who is behind the licensee

company (Iraqi limited company for construction industries; a company of almost the same name, printed on its group's website as AL Shams Instruction Industry L.L.C., belongs to the Al-Etihad Investment Group of Basra, but no source says that it holds this licence)
People connected with the licensee
NameRoleLegal statusSource
Qusay Jaafar Murtadha
قصي جعفر مرتضى
Head of the Al-Etihad Investment Group since 2014, according to the group's website; the group lists among its companies Al Shams company for the production of building blocks (thermostone). The sources do not say that this company is the licence holder.Not charged as of the date of writing
No official finding, court case or press accusation naming him was found. Status as of 1 November 2026.
Document (saved page)aletihad-group.com

What official and press reports say

Official findings
None found in the sources read.
What became of the project
The Basra Investment Commission list records 1 licence for this holder: licence no. 84 of 19 March 2014, Thermiston factory, stated capital USD 11,322,000, land owner not stated, area 10 donums, location 32، مقاطعة 43/ الاركلي الشمالي. The dates are as printed in the list; for several licences the page that carries the licence bears an earlier date. The list records no completion figures for these licences. An interview with the commission's chairman, Ali Jasib, on the Basra Governorate website (the page carries the date 8 March 2019, but the interview speaks of the licences of 2014 and of the then new government of Haider al-Abadi) lists a thermostone factory by an Iraqi company at a cost of USD 11,322,000, the same figure as this licence, with the Ministry of Finance named as the beneficiary body and a term of 18 months; it does not name the company. The Al-Etihad group's website describes its Al Shams thermostone factory as working, with a capacity of 2,500 cubic metres a day, on 150,000 square metres on the Umm Qasr port road, built for about USD 15 million paid privately without bank loans. The area and cost it gives differ from those of this licence (10 donums, USD 11,322,000), so it cannot be said for certain that it is the factory licensed here.
Other contracts with the state
The Al-Etihad Investment Group's website lists other companies of the family besides Al Shams, among them companies for trade in oil products, prefabricated houses, agriculture, food trade, fishing, mine clearance and shipping. The website says Al Shams thermostone has been approved for use in government projects in Basra and other provinces.

Sources

  1. رئيس هيئة أستثمار البصرة : نسعى لتشجيع الاستثمار ونقل التقنيات الحديثة لتطوير واعمار المحافظة استثمرنا 29 مشروعا استثماريا عام 2014 في مختلف القطاعات لدينا مشاريع متوقفة ننتظر وزارة المالية المصادقة عليهاoriginal address, Basra Governorate (official website), 8 March 2019 Tier A
    ومعمل ثرمستون تنفيذ شركة عراقية بكلفة11,322,000 دولار، والجهة المستفيدة وزارة المالية
  2. شركة الشمس لأنتاج و تصنيع طابوق البناء الأتوماتيكيoriginal address, Al-Etihad Investment Group (company website) Tier D
    AL Shams Instruction Industry L.L.C
  3. مجموعة الأتحاد للأستثمارoriginal address, Al-Etihad Investment Group (company website) Tier D
    ألت قيادة المجموعة للسيد قصي جعفر مرتضى