Investment licence of the National Investment Commission, for the project: Conversion of Al-Amarah station to the combined cycle (250 megawatts).

شركة العمارة للطاقة المحدودة

All investment licences

In short

This licence is held by Al-Amarah Energy Company Ltd, and was granted in 2018. The holder's documented legal status: "Not charged as of the date of writing". Published sources state one link between the holder and a politician, a party, an official or an armed group, set out below. A stated link is not a finding of wrongdoing.

MEED reported on 28 September 2016 that the UAE office of ILF Consulting Engineers won a contract of about USD 7.5 million to manage the conversion of the 500 MW Amara power plant into a combined cycle facility, adding up to 250 MW, and that the client was the local Raban al-Safina, which was developing the plant as an independent power project. The World Policy Conference says Hussein Saihood of Raban Al-Safina Group oversaw the Amara Combined Cycle Power Plant. The National Investment Commission licence is for the conversion of the Amara station to combined cycle at 250 MW. None of these sources names the licensee, and the match rests on the project.

Legal status

Not charged as of the date of writing

Not charged as of the date of writing. No court ruling, Integrity Commission statement, audit bureau finding, sanctions listing or credible press accusation naming this company was found in the sources read. The project of the licence matches the Amara conversion that MEED attributes to Raban al-Safina, but no source names the licensee, a company of British Virgin Islands nationality in the National Investment Commission list. The National Investment Commission list records that the maintenance contracts and the tariff were not yet approved. That is a stated project status and not an allegation. Owners and managers were not identified. Absence of findings is not proof that none exist. Status as of 19 October 2026.

The licence as listed

The list of licensed projects of the National Investment Commission.
Licensing body
National Investment Commission
Licence number
231/2018
Date of grant
18 September 2018
Sector
Energy
Project
Conversion of Al-Amarah station to the combined cycle (250 megawatts)
تحويل محطة العمارة الى الدورة المركبة (250 ميكاواط)
Licensee
شركة العمارة للطاقة المحدودة (جزر العذراء البريطانية)
Licensee's official website
No official website found (searched 1 November 2026).
Province
Maysan
Location
ميسان
Stated cost
$480 million
State of the project
Not reported
The commission's remarks and obstacles
بصدد إكمال عقود الصيانة والتشغيل بين وزارة الكهرباء والمستثمر وبانتظار مصادقة لجنة الطاقة على سعر التعرفة.

Who is behind the licensee

company (British Virgin Islands nationality according to the National Investment Commission's list)
People connected with the licensee
NameRoleLegal statusSource
Hussein Saihood
حسين صيهود
Senior vice president of Raban Al Safina Group according to the World Policy Conference, which says he oversaw the Amara Combined Cycle Power Plant. No source says he holds a role in the National Investment Commission licensee.Not charged as of the date of writing
Not charged as of the date of writing. No charge, court ruling, sanction or official finding was found in the sources read. Status as of 19 October 2026.
Document (saved page)worldpolicyconference.com

Links stated in published sources

Each link is attributed to its source. A stated link is not a finding of wrongdoing.
  • MEED reported on 28 September 2016 that the UAE office of ILF Consulting Engineers won a contract of about USD 7.5 million to manage the conversion of the 500 MW Amara power plant into a combined cycle facility, adding up to 250 MW, and that the client was the local Raban al-Safina, which was developing the plant as an independent power project. The World Policy Conference says Hussein Saihood of Raban Al-Safina Group oversaw the Amara Combined Cycle Power Plant. The National Investment Commission licence is for the conversion of the Amara station to combined cycle at 250 MW. None of these sources names the licensee, and the match rests on the project.

    The client for the scheme is the local Raban al-Safina, which is developing the Samara plant as an independent power project (IPP).

    meed.comoriginal address

What official and press reports say

Official findings
None found in the sources read.
What became of the project
The National Investment Commission list records licence 231/2018 dated 18 September 2018 for Conversion of Al-Amarah station to the combined cycle (250 megawatts) in Maysan, sector energy, nationality جزر العذراء البريطانية, at a stated cost of USD 480,000,000. The obstacle recorded is «بصدد إكمال عقود الصيانة والتشغيل بين وزارة الكهرباء والمستثمر وبانتظار مصادقة لجنة الطاقة على سعر التعرفة.», that is, the maintenance and operation contracts between the Ministry of Electricity and the investor were being completed, and the Energy Committee had not yet approved the tariff. MEED reported in 2016 on the conversion of the Amara plant by Raban al-Safina (named «Samara» in the report) as an independent power project. Iraq Business News reported on 6 July 2022 that the Prime Minister opened the Maysan power station in the Al-Kahla district south of Amara, adding 750 MW, of which 500 MW in simple cycle and 250 MW in combined cycle. The National Investment Commission list says the maintenance and operation contracts with the Ministry of Electricity were being completed and that the Energy Committee had not approved the tariff. Whether the National Investment Commission licensee is the company that carried out the conversion is not stated by any source opened.
Other contracts with the state
None found. The National Investment Commission list shows no other licence for this licensee.

Sources

  1. MEED | ILF wins Iraq power contractoriginal address, MEED, 28 September 2016 Tier D
    The client for the scheme is the local Raban al-Safina, which is developing the Samara plant as an independent power project (IPP).
  2. MEED | ILF wins Iraq power contractoriginal address, MEED Tier D
    ILF will manage the conversion of the 500MW Amara power plant into a combined-cycle facility, increasing its capacity by up to 250MW.
  3. PM Opens New Maysan Power Plant | Iraq Business Newsoriginal address, Iraq Business News (citing the Prime Minister's Media Office), 6 July 2022 Tier D
    The new power plant adds 750 megawatts of capacity to the grid, 500 MW of which are produced through simple cycle and 250 MW through combined cycle.