Rania International for General Trading Company (Ranya International; also Rania International Oil Company and Rania Energy and Oil)
Investment licence of the National Investment Commission, for the project: Kirkuk refinery.
شركة رانية الدولية للتجارة العامة
In short
This licence is held by Rania International for General Trading Company (Ranya International; also Rania International Oil Company and Rania Energy and Oil), and was granted in 2018. The holder's documented legal status: "Not charged as of the date of writing".
Legal status
Not charged as of the date of writing
Not charged as of the date of writing. No court ruling, Integrity Commission statement, audit bureau finding, sanctions listing or credible press accusation naming this licensee was found in the sources read. The National Investment Commission list records that work was stopped until the remaining conditions of the investment contract with the Ministry of Oil were met, and Shafaq News reported in January 2025 that the site had not yet been handed over. Those are stated delays and not allegations. The owners were not identified. Jalal Haji Ahmed is named as head of the company. Absence of findings is not proof that none exist. Status as of 19 October 2026.
The licence as listed
- Licensing body
- National Investment Commission
- Licence number
- 251/2018
- Date of grant
- 30 December 2018
- Sector
- Industry
- Project
- Kirkuk refineryمصفى كركوك
- Licensee
- شركة رانية الدولية للتجارة العامة (Iraqi)
- Licensee's official website
- No official website found (searched 1 November 2026).
- Province
- Kirkuk
- Location
- كركوك
- Stated cost
- $2 billion
- State of the project
- Not reported
- The commission's remarks and obstacles
- متوقف لحين إكمال الشروط المتبقية في العقد الاستثماري بين وزارة النفط والشركة.
Who is behind the licensee
| Name | Role | Legal status | Source |
|---|---|---|---|
Jalal Haji Ahmed جلال حاج أحمد | Head of Rania Energy and Oil, per Shafaq News (31 January 2025). | Not charged as of the date of writing Not charged as of the date of writing. Named as the company head. No charge, court ruling, sanction or official finding was found in the sources read. Status as of 19 October 2026. | Document (saved page)Shafaq News |
Rebwar Taha Mustafa ريبوار طه مصطفى | Governor of Kirkuk in January 2025. He said the refinery had the approval of the Prime Minister and the Ministry of Oil (Shafaq News, 31 January 2025). | Not charged as of the date of writing Not charged as of the date of writing. Named as the governor who announced the contract. No charge, court ruling, sanction or official finding was found in the sources read. Status as of 19 October 2026. | Document (saved page)Shafaq News |
Jabbar al-Luaibi جبار اللعيبي | Iraqi Oil Minister, in whose presence the contract was signed on 8 February 2018 (Rudaw). | Not charged as of the date of writing Not charged as of the date of writing. Named as the minister present at the signing. No charge, court ruling, sanction or official finding was found in the sources read. Status as of 19 October 2026. | Document (saved page)Rudaw |
What official and press reports say
- Official findings
- None found in the sources read. The acts on record are the Ministry of Oil contract of February 2018 and the governorate contract of January 2025, both reported as approved by the Prime Minister and the Ministry.
- What became of the project
- The National Investment Commission list records licence 251/2018 dated 30 December 2018 for the Kirkuk refinery (list entry «مصفى كركوك») in Kirkuk, sector industry, nationality Iraqi, at a stated cost of USD 2,000,000,000. Completion is marked «؟». The recorded obstacle is «متوقف لحين إكمال الشروط المتبقية في العقد الاستثماري بين وزارة النفط والشركة.», that is, work was stopped until the remaining conditions in the investment contract between the Ministry of Oil and the company were completed. Rudaw and Reuters reported that the Ministry of Oil signed a contract with Ranya International on 8 February 2018 to build a 70,000 barrel a day refinery in Kirkuk province. Shafaq News reported on 31 January 2025 that the Kirkuk governorate signed an implementation contract worth USD 2 billion, with a construction period of two to three years, about 3,000 jobs, equipment from the US firm UOP, and the refinery site near the North Gas Company southwest of Kirkuk. The Kirkuk governor's investment adviser said construction would start after the site is handed to the company. No report on handover or construction was found.
- Other contracts with the state
- The National Investment Commission list shows one licence for this licensee. Reuters reported on 8 February 2018 that the Ministry of Oil signed an agreement with Ranya International for a 70,000 barrel a day refinery near Kirkuk, with the company to be an investor in it. Shafaq News reported on 31 January 2025 that the Kirkuk governorate signed an implementation contract worth USD 2 billion for the same refinery with Rania International Oil Company.
Sources
- Newsoriginal address, Reuters (as carried by the Environmental Peacebuilding Association), 8 February 2018 Tier D
The agreement was signed with Ranya International, a company based in the semi-autonomous Kurdistan region, north and east of Kirkuk, which would be an investor in the refinery, the ministry said in a statement.
- Iraq signs contract to open new refinery in Kirkukoriginal address, Rudaw, 8 February 2018 Tier D
Iraq’s oil ministry signed a contract with Ranya International to build a refinery with the production capacity of 70,000 bpd in Kirkuk province.
- شفق نيوز..بملياري دولار.. شركة أميركية تجهّز مصفاة كركوك النفطية بالمعداتoriginal address, Shafaq News, 31 January 2025 Tier D
قيمة عقد المشروع تبلغ ملياري دولار وبفترة تنفيذ تتراوح بين عامين وثلاثة اعوام
- شفق نيوز..بملياري دولار.. شركة أميركية تجهّز مصفاة كركوك النفطية بالمعداتoriginal address, Shafaq News, 31 January 2025 Tier D
الفترة المقبلة ستشهد دخول المشروع حيز التنفيذ بعد اتمام الإجراءات الخاصة في عملية تسليم أرض المشروع للشركة
- شفق نيوز..بملياري دولار.. شركة أميركية تجهّز مصفاة كركوك النفطية بالمعداتoriginal address, Shafaq News, 31 January 2025 Tier D
قال مدير شركة رانية للطاقة والنفط جلال حاج أحمد
- شفق نيوز..بملياري دولار.. شركة أميركية تجهّز مصفاة كركوك النفطية بالمعداتoriginal address, Shafaq News, 31 January 2025 Tier D
والشركة المنفذة هي شركة رانية الدولية للنفط
- Shafaq News..Iraq signs $2 billion deal for Kirkuk oil refineryoriginal address, Shafaq News, 31 January 2025 Tier D
The refinery, designed to process 70,000 barrels per day (bpd) of refined oil products, will be built by Rania International Oil Company, with equipment supplied by US firm UOP.