Aswar Fadak General Contracting Company (full name on the Babil Investment Commission documents: Aswar Fadak General Contracting Ltd, with Al-Jouf General Contracting Ltd)
Investment licence of the National Investment Commission, for the project: Residential complex.
شركة أسوار فدك للمقاولات العامة
In short
This licence is held by Aswar Fadak General Contracting Company (full name on the Babil Investment Commission documents: Aswar Fadak General Contracting Ltd, with Al-Jouf General Contracting Ltd), and was granted in 2019. The holder's documented legal status: "Not charged as of the date of writing".
Legal status
Not charged as of the date of writing
Not charged as of the date of writing. No court ruling, Integrity Commission statement, audit bureau finding, sanctions listing or credible press accusation naming this company was found in the sources read. The Babil Investment Commission sent the companies two administrative notices in 2026, one on signing an addendum on liquid gas networks and one on the follow-up fee. Neither states a violation or withdraws the licence. The table of projects for 2025 lists the complex at 16 percent complete. Owners and managers were not identified. Absence of findings is not proof that none exist. Status as of 19 October 2026.
The licence as listed
- Licensing body
- National Investment Commission
- Licence number
- 321/2019
- Date of grant
- 6 October 2019
- Sector
- Housing
- Project
- Residential complexمجمع سكني
- Licensee
- شركة أسوار فدك للمقاولات العامة (Iraqi)
- Licensee's official website
- No official website found (searched 1 November 2026).
- Province
- Babil
- Location
- بابل
- Stated cost
- $12.6 millionThe list gives the cost in dinars. It is converted here at 1,190 dinars to the dollar.
- State of the project
- New licence
- The commission's remarks and obstacles
- أجازة حديثة
Who is behind the licensee
The owners and managers were not identified in the sources that were read.
What official and press reports say
- Official findings
- No finding of wrongdoing. The Babil Investment Commission's two notices of 2026 are routine administrative demands, one to sign an addendum on liquid gas networks and one for the annual follow-up fee. The first warns of legal measures under Article 28 of the Investment Law if the companies do not comply. No withdrawal of the licence was announced in the sources read.
- What became of the project
- The National Investment Commission list records licence 321/2019 for a residential complex (list entry «مجمع سكني») in Babil, sector housing, nationality Iraqi, at a stated cost of IQD 15,000,000,000. The list writes the date as 10 June 2019. Completion is marked «؟» and the obstacle reads «أجازة حديثة», that is, the licence was recently issued. The Babil Investment Commission's table of projects for 2025 gives the grant date as 6 October 2019, so the list has day and month transposed. It lists the complex at 16 percent complete, with work starting on 1 March 2025 and a follow-up fee of IQD 3,000,000 shown as paid by receipt No. 369 of 15 December 2025 (read by eye from a scan). The Commission sent the two companies a notice dated June 2026 (published 10 June 2026), referring to its letter No. 260 of 19 January 2026 and to an National Investment Commission letter of 25 May 2025 obliging housing complexes to use liquid gas networks, and asking them to attend its office to sign an addendum to the investment contract within 15 days, failing which it would take all legal measures under Article 28 of Investment Law No. 13 of 2006 as amended. A further notice dated 21 August 2026 (published 2 September 2026) asked the companies to pay the 2026 follow-up fee of IQD 3,000,000 for the residential complex licence. Both documents are scans read by eye. The Commission published similar notices to many investors in 2026.
- Other contracts with the state
- None found. The National Investment Commission list shows no other licence for this company.
Sources
- إلى / المستثمر اسوار فدك للمقاولات العامة المحدودة وشركة الجوف للتجارة والمقاولات العامةoriginal address, Babylon Investment Commission, 10 June 2026 Tier A
إلحاقاً بكتابنا المرقم (٢٦٠ في ١٩ / ١ / ٢٠٢٦) وإشارة إلى كتاب الهيئة الوطنية للاستثمار المرقم (ت.م. / ١٢٣٧ في ٢٥ / ٥ / ٢٠٢٥) الخاص بإلزامكم بشبكات الغاز السائل في المجمعات
- Notice attached to news item 10361 (scanned letter)original address, Babylon Investment Commission, 10 June 2026 Tier A
الخاص بإلزامكم بشبكات الغاز السائل في المجمعات السكنية
- الى المستثمر (شركة اسوار فدك للمقاولات العامة المحدودة وشركة الجوف للمقاولات العامة المحدودة)original address, Babylon Investment Commission, 2 September 2026 Tier A
الى المستثمر (شركة اسوار فدك للمقاولات العامة المحدودة وشركة الجوف للمقاولات العامة المحدودة)
- Notice attached to news item 10487 (scanned letter): أجور متابعةoriginal address, Babylon Investment Commission, 2 September 2026 Tier A
م / أجور متابعة
- Table of projects for 2025 (page 5 of the PDF attached to news item 10248)original address, Babylon Investment Commission, 18 January 2026 Tier A
شركة اسوار فدك للمقاولات العامة المحدودة وشركة الجوف للمقاولات العامة المحدودة