Iraq's Corruption
People & Institutions

Al-Narges Contracting Company

Investment licence of the National Investment Commission, for the project: Al-Narjis plant for producing UPVC-HDPE pipes.

شركة النرجس للمقاولات

All investment licences

In short

This licence is held by Al-Narges Contracting Company, and was granted in 2019. The holder's documented legal status: "Not charged as of the date of writing". Published sources state one link between the holder and a politician, a party, an official or an armed group, set out below. A stated link is not a finding of wrongdoing.

Baghdad Today reported on 3 June 2022 that the former MP Wael Abdul-Latif accused the Al-Narges company of controlling projects in Basra, and that the company's manager Hatem Al-Daraji replied that of about 700 governorate projects only 11 had been awarded to the company. The agency gives the accusation only in summary, and no document, court ruling or Integrity Commission finding supports it in the sources read. It is recorded as a statement and not as a finding. The same company is researched at Al-Narges Company for Contracting and General Trading (the Al-Narges housing licence).

Legal status

Not charged as of the date of writing

Not charged as of the date of writing. No court ruling, Integrity Commission statement, audit bureau finding, sanctions listing or credible press accusation naming this licensee was found in the sources read. A former MP, Wael Abdul-Latif, was reported in June 2022 to have accused the company of controlling projects in Basra, and the company's manager answered; that is a second hand report of a statement and no document supports it. The National Investment Commission list records the licence as recently issued. That is a stated condition and not an allegation. Those items are recorded as statements and flagged for review. No register of shareholders was found. Absence of findings is not proof that none exist. Status as of 19 October 2026.

The licence as listed

The list of licensed projects of the National Investment Commission.
Licensing body
National Investment Commission
Licence number
333/2019
Date of grant
25 December 2019
Sector
Industry
Project
Al-Narjis plant for producing UPVC-HDPE pipes
معمل النرجس لانتاج الانابيب (UPVC-HDPE)
Licensee
شركة النرجس للمقاولات (Iraqi)
Licensee's official website
No official website found (searched 1 November 2026).
Province
Basra
Location
البصرة
Stated cost
$4.8 million
The list gives the cost in dinars. It is converted here at 1,190 dinars to the dollar.
State of the project
New licence
The commission's remarks and obstacles
أجازة حديثة

Who is behind the licensee

company (Iraqi limited company according to the National Investment Commission's list and the Basra Investment Commission; the manager of the Al-Narges companies, Hatem Al-Daraji, said in 2022 that the company is his)
People connected with the licensee
NameRoleLegal statusSource
Hatem Al-Daraji
حاتم الدراجي
Manager of the Al-Narges companies (مدير شركات النرجس) per Baghdad Today (30 June 2026). On 3 June 2022 Baghdad Today quoted him as saying that the company is his and has more than 7,000 employees.Not charged as of the date of writing
Not charged as of the date of writing. Baghdad Today reported on 3 June 2022 that the former MP Wael Abdul-Latif accused the company of controlling projects in Basra, and quoted the manager's reply.… Read the rest The accusation is reported second hand, and no document, court ruling or Integrity Commission finding supports it in the sources read. Status as of 19 October 2026.
Document (saved page)Baghdad Today

Links stated in published sources

Each link is attributed to its source. A stated link is not a finding of wrongdoing.
  • Baghdad Today reported on 3 June 2022 that the former MP Wael Abdul-Latif accused the Al-Narges company of controlling projects in Basra, and that the company's manager Hatem Al-Daraji replied that of about 700 governorate projects only 11 had been awarded to the company. The agency gives the accusation only in summary, and no document, court ruling or Integrity Commission finding supports it in the sources read. It is recorded as a statement and not as a finding. The same company is researched at Al-Narges Company for Contracting and General Trading (the Al-Narges housing licence).

    مجموع مشاريع المحافظة بجميع القطاعات 700 مشروع وما احيل منها لشركة النرجس هي فقط 11 مشروعاً

    baghdadtoday.newsoriginal address

What official and press reports say

Official findings
None found naming the licensee. Official acts on record are the governorate's tour of 22 October 2024 and the Basra Investment Commission's licence pages. Neither states a violation.
What became of the project
The National Investment Commission list records licence 333/2019 dated 25 December 2019 for the Al-Narges plant for UPVC and HDPE pipes (list entry «معمل النرجس لانتاج الانابيب (UPVC-HDPE)») in Basra, sector industry, nationality Iraqi, at a stated cost of IQD 5,710,200,000. Completion is marked «؟» and the obstacle reads «أجازة حديثة», that is, the licence was recently issued. The Basra Investment Commission's licence page T/123 gives the same issue date, 25 December 2019, and the same project, Al-Narges plant for HDPE and UPVC pipes, with a project capital of IQD 20,123,600,000, a two year execution period and an area of 37 dunums and 2,350 square metres. The list gives a lower cost. Baghdad Today reported on 30 June 2026 a security operation inside the Al-Narges residential city, which the city's management described as the execution of an arrest warrant against one resident. That concerns the housing city and not the pipe plant, and no charge against the resident was found.
Other contracts with the state
The National Investment Commission list shows a housing licence for the same company at Al-Narges Company for Contracting and General Trading. The Basra Investment Commission's licence pages show a second pipe plant licence, T/122 (GRP pipes, 6 September 2021, USD 31,712,300), a Basra gate residential complex (T/113, 16 December 2021) and a residential complex 2 (T/106, 15 March 2021). 964 Media reported on 22 October 2024 that the Basra governor's technical deputy toured the company's industrial projects, GRP and pipe plants, wood and carpentry factories and a suspension bridge linking the sports city to Basra airport, and said that the governorate had stopped housing investments until a full investment map is set.

Sources

  1. اجازة استثمار رقم ت/ 123original address, Basra Investment Commission, 11 September 2022 Tier A
    معمل النرجس لإنتاج الانابيب (HDPE-UPVC)
  2. اجازة استثمار رقم ت/ 123original address, Basra Investment Commission, 11 September 2022 Tier A
    20.123.600.000 دينار عراقي
  3. شركة النرجس ترد على اتهام وائل عبد اللطيف: رفضنا مشروع "أبنك" فاتهمت الشركة بمعلومات كاذبة! (صوت)original address, Baghdad Today, 3 June 2022 Tier D
    ردت شركة النرجس في محافظة البصرة، اليوم الجمعة، على النائب الأسبق وائل عبد اللطيف الذي اتهم بها الشركة بالسيطرة على المشاريع
  4. شاهد: جسر يربط مطار البصرة بالمدينة الرياضية.. الرابع من نوعه وتنفذه شركة عراقيةoriginal address, 964 Media, 22 October 2024 Tier D
    أجرى النائب الفني لمحافظ البصرة زيد الإمارة، جولة ميدانية على مشاريع شركة النرجس الصناعية وهي معامل GRP والأنابيب ومصانع الأخشاب والنجارة