Iraq's Corruption
People & Institutions

Karbala Cement Manufacturing Company Limited

Investment licence of the National Investment Commission, for the project: Rehabilitation and operation of Karbala cement plant.

شركة كربلاء لصناعة الاسمنت المحدودة

All investment licences

In short

This licence is held by Karbala Cement Manufacturing Company Limited, and was granted in 2011. The holder's documented legal status: "Not charged as of the date of writing".

Legal status

Not charged as of the date of writing

Not charged as of the date of writing. No court ruling, Integrity Commission or audit bureau finding, licence withdrawal, sanctions listing or credible press accusation naming the company was found in the sources read. Lafarge and MerchantBridge are reported as the owners of the company that operates the Karbala plant; the licensee is probably that company, which is not confirmed. Absence of findings is not proof that none exist. Status as of 2 November 2026.

The licence as listed

The list of licensed projects of the National Investment Commission.
Licensing body
National Investment Commission
Licence number
26/2011
Date of grant
20 March 2011
Sector
Industry
Project
Rehabilitation and operation of Karbala cement plant
تأهيل وتشغيل معمل سمنت كربلاء
Licensee
شركة كربلاء لصناعة الاسمنت المحدودة (Iraqi)
Licensee's official website
No official website found (searched 1 November 2026).
Province
Karbala
Location
كربلاء المقدسة
Stated cost
$220 million
State of the project
Completed (100% complete)

Who is behind the licensee

company
People connected with the licensee
NameRoleLegal statusSource
Lafarge (France)
لافارج (فرنسا)
Reported partner and operator of the Karbala cement plant through Kerbala Cement Manufacturing, in joint venture with MerchantBridge (Private Equity Wire, 4 October 2010; Iraq Business News, 1 January 2013). The link between Kerbala Cement Manufacturing and the licensee rests on the name, the plant and the cost.Not charged as of the date of writing
Not charged as of the date of writing. No charge, court ruling, sanction or official finding was found in the sources read. Status as of 2 November 2026.
Document (saved page)Iraq Business News
MerchantBridge (London private equity group)
ميرتشانت بريدج (مجموعة أسهم خاصة في لندن)
Reported partner of Lafarge in Kerbala Cement Manufacturing, the operator of the Karbala cement plant (Private Equity Wire, 4 October 2010; MEED, 10 January 2011). The link between Kerbala Cement Manufacturing and the licensee rests on the name, the plant and the cost.Not charged as of the date of writing
Not charged as of the date of writing. No charge, court ruling, sanction or official finding was found in the sources read. Status as of 2 November 2026.
Document (saved page)privateequitywire.co.uk

What official and press reports say

Official findings
None found in the sources read. No court ruling, Integrity Commission statement or audit bureau finding naming the company was found.
What became of the project
National Investment Commission licence 26/2011, dated 20/3/2011, to rehabilitate and operate the Karbala cement plant, stated cost USD 220,000,000. The state plant is listed among the plants of the Iraqi Cement State Company. An Arabic encyclopedia entry, which cites the state company's website, places it in Ain al-Tamr district of Karbala province, with a design capacity of 2,000,000 tonnes a year, built by Krupp Polysius of Germany, with construction from 1981 and production from 1984. Private Equity Wire reported on 4 October 2010 that the plant then made less than 300,000 tons a year and that the partners aimed at 2 million tons within 30 months. MEED reported on 10 January 2011 that the rehabilitation, a USD 200 million project, was due to finish by March 2013 and that the plant would be leased from the government for 15 years. Iraq Business News reported on 1 January 2013 that the IFC was lending USD 70 million, and Proparco USD 20 million, to Kerbala Cement Manufacturing to rehabilitate the plant. No report on the plant after 2013 was found. The Lafarge Iraq website pages read on an earlier date list only the Bazian plant and do not mention Karbala.
Other contracts with the state
None found under the licensee's Iraqi name. MEED reported on 10 January 2011 that MerchantBridge and Lafarge also planned a new plant of about 2 million tonnes a year close to the Karbala plant, on land the government had allocated; the sources read do not say whether it was built.

Sources

  1. الشركة العامة للسمنت العراقيةoriginal address, Arabic Wikipedia (citing the Iraqi Cement State Company website) Tier D
    معمل سمنت كربلاء || محافظة كربلاء، قضاء عين التمر || سمنت بورتلاندي مقاوم للأملاح || 2 || (2000000) طن سنوياً || 1981 || 1984 || Krupp Polysius الألمانية
  2. MerchantBridge invests in Iraq's Karbala cement plantoriginal address, Private Equity Wire, 4 October 2010 Tier D
    Private equity group MerchantBridge and partner Lafarge have assumed control of the Karbala Cement Plant.
  3. MerchantBridge and Lafarge plan new Iraq cement plant at Karbalaoriginal address, MEED, 10 January 2011 Tier D
    Merchant Bridge and Lafarge are the joint venture partners behind the $200m Karbala cement plant rehabilitation project
  4. World Bank to Finance Lafarge Cement Plant in Kerbalaoriginal address, Iraq Business News (from an IFC release), 1 January 2013 Tier D
    Kerbala Cement is a joint venture between Lafarge and MerchantBridge, a London-based private equity group.