Iraq's Corruption
People & Institutions

Ahmed Mahdi Matar

Investment licence of the National Investment Commission, for the project: Babil Plaza hotel.

احمد مهدي مطر

All investment licences

In short

This licence is held by Ahmed Mahdi Matar, and was granted in 2015. The holder's documented legal status: "Not charged as of the date of writing".

Legal status

Not charged as of the date of writing

Not charged as of the date of writing. No court ruling, Integrity Commission statement, audit bureau finding, sanctions listing or credible press accusation naming this licensee was found in the sources read. A 964 report of 3 June 2023 says the Babil Investment Commission withdrew the licence of a project called Babylon Plaza Hotel held by a local investor, whom it does not name, after seven years of delay. The link to this licensee rests on the project name. The Babylon Investment Commission published on its website 3 notices addressed to this investor between 11 May 2026 and 17 August 2026 (1 notification, 2 warnings). The notice pages carry the title only and state no reason. The notice of 11 May 2026 concerns an encroachment on state land under a 2025 licence and does not say that it is the same person. Delay and encroachment are the matters stated. No charge, court ruling, sanction or official finding was found in the sources read. Owners and managers were not identified. Absence of findings is not proof that none exist. Status as of 19 October 2026.

The licence as listed

The list of licensed projects of the National Investment Commission.
Licensing body
National Investment Commission
Licence number
65/2015
Date of grant
15 November 2015
Sector
Tourism
Project
Babil Plaza hotel
فندق بابل بلازا
Licensee
احمد مهدي مطر (Iraqi)
Province
Babil
Location
محافظة بابل
Stated cost
$19.2 million
The list gives the cost in dinars. It is converted here at 1,190 dinars to the dollar.
State of the project
Contract not signed (0% complete)
The commission's remarks and obstacles
· لم يتم توقيع العقد مع بلدية الحلة لغاية الآن ولم يتم تسليم الأرض لوجود تعارضات .

Who is behind the licensee

individual
People connected with the licensee
NameRoleLegal statusSource
Ahmed Mahdi Matar
احمد مهدي مطر
Licensee of two Babil licences in the National Investment Commission list: the Babylon Plaza Hotel (65/2015) and the Global Green Buildings factory (82/2016). A Babylon Investment Commission notice of 11 May 2026 and two warnings of 13 and 17 August 2026 name an investor with the same name.Not charged as of the date of writing
Not charged as of the date of writing. Named in the National Investment Commission list as an investment licensee and as the addressee of investment commission notices. No charge, court ruling,… Read the rest sanction or official finding was found in the sources read. Status as of 19 October 2026.
Document (saved page)bic.gov.iq

What official and press reports say

Official findings
964 reported on 3 June 2023 that the Babil Investment Commission withdrew the licence of the Babylon Plaza Hotel project, giving delay over seven years as the reason and citing Investment Law No. 13 of 2006 as amended. The Babylon Investment Commission published on its website 3 notices addressed to this investor between 11 May 2026 and 17 August 2026 (1 notification, 2 warnings). The notice pages carry the title only and state no reason. The notice of 11 May 2026 says the commission would take legal measures if the encroachment was not removed. No finding of corruption is reported.
What became of the project
The National Investment Commission list records licence 65/2015 dated 15 November 2015 for Babil Plaza hotel in Babil, sector tourism, nationality Iraqi, at a stated cost of IQD 22,838,730,000 (about USD 19,192,210 at 1,190 dinars to the dollar, our arithmetic, tier B). Completion is recorded as 0 per cent. The list marks the licence as: contract not signed. The obstacle recorded is «لم يتم توقيع العقد مع بلدية الحلة لغاية الآن ولم يتم تسليم الأرض لوجود تعارضات .», that is, the contract with Hilla municipality was not signed and the land was not handed over because of conflicts. The National Investment Commission list records licence 82/2016 dated 14 March 2016 for International Green Buildings factory in Babil, sector industry, nationality Iraqi, at a stated cost of IQD 7,162,500,000 (about USD 6,018,908 at 1,190 dinars to the dollar, our arithmetic, tier B). Completion is recorded as 0 per cent. The list marks the licence as: contract not signed. The obstacle recorded is «لم يتم تسليم الأرض وتوقيع العقد من قبل الجهة المالكة للأرض عقارات الدولة / وزارة المالية .», that is, the land was not handed over and the contract was not signed by the body that owns the land, State Real Estate of the Ministry of Finance. On 3 June 2023, 964 reported that the head of the Babil Investment Commission, Mohammed Jasim Zakam, announced the halt of work on four investment projects and the withdrawal of their licences after work stalled over seven years. The licences named were a ceramics plant of a Chinese company, the Babylon Plaza Hotel of a local investor, a glass bottle plant of a local investor and a commercial centre of a local investor. The report names no investor. The link to this licensee rests on the project name, the province and the length of the delay. The Global Green Buildings factory is not among the four named.
Other contracts with the state
The National Investment Commission list shows a second licence under this name: 82/2016 for the Global Green Buildings factory in Babil (details above). A Babylon Investment Commission notice of 11 May 2026 addressed to «احمد مهدي مطر» refers to a different licence, 250/2025, for plot 16/3M29 in the Abu Ajarib area, and says State Real Estate reported an encroachment on part of the plot. The notice does not say that this is the same person.

Sources

  1. بابل تعاقب شركة صينية ومستثمرين: استنفذوا كلّ الفرص ولا مكان لـ "المتلكئين"original address, 964 (Network 964), 3 June 2023 Tier D
    أكد رئيس هيئة استثمار بابل محمد جاسم زكم، السبت، إيقاف العمل في 4 مشاريع استثمارية وسحب رخص الشركات المنفذة بعد تلكؤ العمل على مدار 7 سنوات.
  2. بابل تعاقب شركة صينية ومستثمرين: استنفذوا كلّ الفرص ولا مكان لـ “المتلكئين”original address, 964 (Network 964), 3 June 2023 Tier D
    الإجازات الاستثمارية التي تم سحبها هي؛ معمل إنتاج السيراميك لشركة صينية، فندق بابل بلازا لمستثمر محلي، معمل إنتاج القناني الزجاجية لمستثمر محلي ومركز تجاري لمستثمر محلي.
  3. بابل تعاقب شركة صينية ومستثمرين: استنفذوا كلّ الفرص ولا مكان لـ “المتلكئين”original address, 964 (Network 964), 3 June 2023 Tier D
    وقرار سحب الرخص يستند إلى قانون الاستثمار رقم 13 لسنه 2006 المعدل.
  4. الى/ المستثمر ( احمد مهدي مطر ) م/ تبليغoriginal address, Babylon Investment Commission (bic.gov.iq), 11 May 2026 Tier A
    حصول تجاوز من قبلكم على جزء من القطعة المرقمة (16/ 3م 29) ابو عجارب الممنوح اجازة استثمارية (250 / 2025 )
  5. انذار الى المستثمر (احمد مهدي مطر)original address, Babylon Investment Commission (bic.gov.iq), 13 August 2026 Tier A
    انذار الى المستثمر (احمد مهدي مطر)
  6. انذار/ الى المستثمر (احمد مهدي مطر)original address, Babylon Investment Commission (bic.gov.iq), 17 August 2026 Tier A
    انذار/ الى المستثمر (احمد مهدي مطر)

Other licences of the same licensee